A general resource-constrained short-term scheduling model for multipurpose batch plants using synchronous slots

AIChE Annual Meeting, Conference Proceedings

Saved in:
Bibliographic Details
Main Authors: Sundaramoorthy, A., Karimi, I.A., Yu, L., Srinivasan, R.
Other Authors: CHEMICAL & BIOMOLECULAR ENGINEERING
Format: Conference or Workshop Item
Published: 2014
Online Access:http://scholarbank.nus.edu.sg/handle/10635/74440
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: National University of Singapore
id sg-nus-scholar.10635-74440
record_format dspace
spelling sg-nus-scholar.10635-744402015-01-07T08:39:02Z A general resource-constrained short-term scheduling model for multipurpose batch plants using synchronous slots Sundaramoorthy, A. Karimi, I.A. Yu, L. Srinivasan, R. CHEMICAL & BIOMOLECULAR ENGINEERING AIChE Annual Meeting, Conference Proceedings 7550-7554 2014-06-19T06:12:30Z 2014-06-19T06:12:30Z 2005 Conference Paper Sundaramoorthy, A.,Karimi, I.A.,Yu, L.,Srinivasan, R. (2005). A general resource-constrained short-term scheduling model for multipurpose batch plants using synchronous slots. AIChE Annual Meeting, Conference Proceedings : 7550-7554. ScholarBank@NUS Repository. http://scholarbank.nus.edu.sg/handle/10635/74440 NOT_IN_WOS Scopus
institution National University of Singapore
building NUS Library
country Singapore
collection ScholarBank@NUS
description AIChE Annual Meeting, Conference Proceedings
author2 CHEMICAL & BIOMOLECULAR ENGINEERING
author_facet CHEMICAL & BIOMOLECULAR ENGINEERING
Sundaramoorthy, A.
Karimi, I.A.
Yu, L.
Srinivasan, R.
format Conference or Workshop Item
author Sundaramoorthy, A.
Karimi, I.A.
Yu, L.
Srinivasan, R.
spellingShingle Sundaramoorthy, A.
Karimi, I.A.
Yu, L.
Srinivasan, R.
A general resource-constrained short-term scheduling model for multipurpose batch plants using synchronous slots
author_sort Sundaramoorthy, A.
title A general resource-constrained short-term scheduling model for multipurpose batch plants using synchronous slots
title_short A general resource-constrained short-term scheduling model for multipurpose batch plants using synchronous slots
title_full A general resource-constrained short-term scheduling model for multipurpose batch plants using synchronous slots
title_fullStr A general resource-constrained short-term scheduling model for multipurpose batch plants using synchronous slots
title_full_unstemmed A general resource-constrained short-term scheduling model for multipurpose batch plants using synchronous slots
title_sort general resource-constrained short-term scheduling model for multipurpose batch plants using synchronous slots
publishDate 2014
url http://scholarbank.nus.edu.sg/handle/10635/74440
_version_ 1681087929755107328