Examination of the effectiveness and robustness of the heuristics for bay-based quay crane scheduling problem in port container terminals
10.1109/IEEM.2011.6118123
Saved in:
Main Authors: | Chen, J.H., Zhang, S.X., Lee, D.H. |
---|---|
Other Authors: | CIVIL & ENVIRONMENTAL ENGINEERING |
Format: | Conference or Workshop Item |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/75129 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Quay crane scheduling with handling priority in port container terminals
by: Lee, D.-H., et al.
Published: (2014) -
Quay crane scheduling with non-interference constraints in port container terminals
by: Lee, D.-H., et al.
Published: (2014) -
An approximation algorithm for quay crane scheduling with handling priority in port container terminals
by: Lee, D.-H., et al.
Published: (2014) -
Quay crane scheduling with non-crossing and safety distance constraints in port container terminals
by: Wang, H.Q., et al.
Published: (2014) -
Heuristics for quay crane scheduling at indented berth
by: Chen, J.H., et al.
Published: (2014)