An improved approach for quay crane scheduling with non-crossing constraints
10.1080/03052150902943020
Saved in:
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Article |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/84518 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
id |
sg-nus-scholar.10635-84518 |
---|---|
record_format |
dspace |
spelling |
sg-nus-scholar.10635-845182023-10-29T23:21:37Z An improved approach for quay crane scheduling with non-crossing constraints Lee, D.-H. Chen, J.H. CIVIL ENGINEERING Approximation algorithms Non-crossing constraints Quay crane scheduling 10.1080/03052150902943020 Engineering Optimization 42 1 1-15 EGOPA 2014-10-07T06:26:06Z 2014-10-07T06:26:06Z 2010-01 Article Lee, D.-H., Chen, J.H. (2010-01). An improved approach for quay crane scheduling with non-crossing constraints. Engineering Optimization 42 (1) : 1-15. ScholarBank@NUS Repository. https://doi.org/10.1080/03052150902943020 0305215X http://scholarbank.nus.edu.sg/handle/10635/84518 000277512500001 Scopus |
institution |
National University of Singapore |
building |
NUS Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NUS Library |
collection |
ScholarBank@NUS |
topic |
Approximation algorithms Non-crossing constraints Quay crane scheduling |
spellingShingle |
Approximation algorithms Non-crossing constraints Quay crane scheduling Lee, D.-H. Chen, J.H. An improved approach for quay crane scheduling with non-crossing constraints |
description |
10.1080/03052150902943020 |
author2 |
CIVIL ENGINEERING |
author_facet |
CIVIL ENGINEERING Lee, D.-H. Chen, J.H. |
format |
Article |
author |
Lee, D.-H. Chen, J.H. |
author_sort |
Lee, D.-H. |
title |
An improved approach for quay crane scheduling with non-crossing constraints |
title_short |
An improved approach for quay crane scheduling with non-crossing constraints |
title_full |
An improved approach for quay crane scheduling with non-crossing constraints |
title_fullStr |
An improved approach for quay crane scheduling with non-crossing constraints |
title_full_unstemmed |
An improved approach for quay crane scheduling with non-crossing constraints |
title_sort |
improved approach for quay crane scheduling with non-crossing constraints |
publishDate |
2014 |
url |
http://scholarbank.nus.edu.sg/handle/10635/84518 |
_version_ |
1781784463683878912 |