Metaheuristics for minimizing the makespan of the dynamic shop scheduling problem
10.1016/j.advengsoft.2004.10.002
Saved in:
Main Authors: | , , |
---|---|
Other Authors: | |
Format: | Article |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/87072 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
id |
sg-nus-scholar.10635-87072 |
---|---|
record_format |
dspace |
spelling |
sg-nus-scholar.10635-870722023-10-25T20:51:24Z Metaheuristics for minimizing the makespan of the dynamic shop scheduling problem Liu, S.Q. Ong, H.L. Ng, K.M. INDUSTRIAL & SYSTEMS ENGINEERING Dynamic shop scheduling Group-shop Machine scheduling Makespan Metaheuristics Mixed-shop 10.1016/j.advengsoft.2004.10.002 Advances in Engineering Software 36 3 199-205 AESOD 2014-10-07T10:23:57Z 2014-10-07T10:23:57Z 2005-03 Article Liu, S.Q., Ong, H.L., Ng, K.M. (2005-03). Metaheuristics for minimizing the makespan of the dynamic shop scheduling problem. Advances in Engineering Software 36 (3) : 199-205. ScholarBank@NUS Repository. https://doi.org/10.1016/j.advengsoft.2004.10.002 09659978 http://scholarbank.nus.edu.sg/handle/10635/87072 000226881000006 Scopus |
institution |
National University of Singapore |
building |
NUS Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NUS Library |
collection |
ScholarBank@NUS |
topic |
Dynamic shop scheduling Group-shop Machine scheduling Makespan Metaheuristics Mixed-shop |
spellingShingle |
Dynamic shop scheduling Group-shop Machine scheduling Makespan Metaheuristics Mixed-shop Liu, S.Q. Ong, H.L. Ng, K.M. Metaheuristics for minimizing the makespan of the dynamic shop scheduling problem |
description |
10.1016/j.advengsoft.2004.10.002 |
author2 |
INDUSTRIAL & SYSTEMS ENGINEERING |
author_facet |
INDUSTRIAL & SYSTEMS ENGINEERING Liu, S.Q. Ong, H.L. Ng, K.M. |
format |
Article |
author |
Liu, S.Q. Ong, H.L. Ng, K.M. |
author_sort |
Liu, S.Q. |
title |
Metaheuristics for minimizing the makespan of the dynamic shop scheduling problem |
title_short |
Metaheuristics for minimizing the makespan of the dynamic shop scheduling problem |
title_full |
Metaheuristics for minimizing the makespan of the dynamic shop scheduling problem |
title_fullStr |
Metaheuristics for minimizing the makespan of the dynamic shop scheduling problem |
title_full_unstemmed |
Metaheuristics for minimizing the makespan of the dynamic shop scheduling problem |
title_sort |
metaheuristics for minimizing the makespan of the dynamic shop scheduling problem |
publishDate |
2014 |
url |
http://scholarbank.nus.edu.sg/handle/10635/87072 |
_version_ |
1781784989282598912 |