The economic lot scheduling problem under extended basic period and power-of-two policy
Optimization Letters
Saved in:
Main Authors: | , , |
---|---|
Other Authors: | |
Format: | Article |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/87265 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
id |
sg-nus-scholar.10635-87265 |
---|---|
record_format |
dspace |
spelling |
sg-nus-scholar.10635-872652023-08-22T08:17:09Z The economic lot scheduling problem under extended basic period and power-of-two policy Sun, H. Huang, H.-C. Jaruphongsa, W. INDUSTRIAL & SYSTEMS ENGINEERING ELSP Heuristic Parametric search algorithm Power-of-two Optimization Letters 4 2 157-172 2014-10-07T10:26:10Z 2014-10-07T10:26:10Z 2010 Article Sun, H., Huang, H.-C., Jaruphongsa, W. (2010). The economic lot scheduling problem under extended basic period and power-of-two policy. Optimization Letters 4 (2) : 157-172. ScholarBank@NUS Repository. 18624472 http://scholarbank.nus.edu.sg/handle/10635/87265 000276366600001 Scopus |
institution |
National University of Singapore |
building |
NUS Library |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
NUS Library |
collection |
ScholarBank@NUS |
topic |
ELSP Heuristic Parametric search algorithm Power-of-two |
spellingShingle |
ELSP Heuristic Parametric search algorithm Power-of-two Sun, H. Huang, H.-C. Jaruphongsa, W. The economic lot scheduling problem under extended basic period and power-of-two policy |
description |
Optimization Letters |
author2 |
INDUSTRIAL & SYSTEMS ENGINEERING |
author_facet |
INDUSTRIAL & SYSTEMS ENGINEERING Sun, H. Huang, H.-C. Jaruphongsa, W. |
format |
Article |
author |
Sun, H. Huang, H.-C. Jaruphongsa, W. |
author_sort |
Sun, H. |
title |
The economic lot scheduling problem under extended basic period and power-of-two policy |
title_short |
The economic lot scheduling problem under extended basic period and power-of-two policy |
title_full |
The economic lot scheduling problem under extended basic period and power-of-two policy |
title_fullStr |
The economic lot scheduling problem under extended basic period and power-of-two policy |
title_full_unstemmed |
The economic lot scheduling problem under extended basic period and power-of-two policy |
title_sort |
economic lot scheduling problem under extended basic period and power-of-two policy |
publishDate |
2014 |
url |
http://scholarbank.nus.edu.sg/handle/10635/87265 |
_version_ |
1776258716813754368 |