Unit slots based short-term scheduling for multipurpose batch plants
10.1016/S1570-7946(09)70722-9
Saved in:
Main Authors: | , , |
---|---|
Other Authors: | |
Format: | Conference or Workshop Item |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/90761 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
id |
sg-nus-scholar.10635-90761 |
---|---|
record_format |
dspace |
spelling |
sg-nus-scholar.10635-907612015-01-11T20:02:29Z Unit slots based short-term scheduling for multipurpose batch plants Susarla, N. Li, J. Karimi, I.A. CHEMICAL & BIOMOLECULAR ENGINEERING MILP Multipurpose batch plants Scheduling Slot based formulations Unit slots 10.1016/S1570-7946(09)70722-9 Computer Aided Chemical Engineering 27 C 1989-1994 2014-10-09T07:08:50Z 2014-10-09T07:08:50Z 2009 Conference Paper Susarla, N.,Li, J.,Karimi, I.A. (2009). Unit slots based short-term scheduling for multipurpose batch plants. Computer Aided Chemical Engineering 27 (C) : 1989-1994. ScholarBank@NUS Repository. <a href="https://doi.org/10.1016/S1570-7946(09)70722-9" target="_blank">https://doi.org/10.1016/S1570-7946(09)70722-9</a> 15707946 http://scholarbank.nus.edu.sg/handle/10635/90761 NOT_IN_WOS Scopus |
institution |
National University of Singapore |
building |
NUS Library |
country |
Singapore |
collection |
ScholarBank@NUS |
topic |
MILP Multipurpose batch plants Scheduling Slot based formulations Unit slots |
spellingShingle |
MILP Multipurpose batch plants Scheduling Slot based formulations Unit slots Susarla, N. Li, J. Karimi, I.A. Unit slots based short-term scheduling for multipurpose batch plants |
description |
10.1016/S1570-7946(09)70722-9 |
author2 |
CHEMICAL & BIOMOLECULAR ENGINEERING |
author_facet |
CHEMICAL & BIOMOLECULAR ENGINEERING Susarla, N. Li, J. Karimi, I.A. |
format |
Conference or Workshop Item |
author |
Susarla, N. Li, J. Karimi, I.A. |
author_sort |
Susarla, N. |
title |
Unit slots based short-term scheduling for multipurpose batch plants |
title_short |
Unit slots based short-term scheduling for multipurpose batch plants |
title_full |
Unit slots based short-term scheduling for multipurpose batch plants |
title_fullStr |
Unit slots based short-term scheduling for multipurpose batch plants |
title_full_unstemmed |
Unit slots based short-term scheduling for multipurpose batch plants |
title_sort |
unit slots based short-term scheduling for multipurpose batch plants |
publishDate |
2014 |
url |
http://scholarbank.nus.edu.sg/handle/10635/90761 |
_version_ |
1681090650194313216 |