Integrated prefabrication configuration and component grouping for resource optimization of precast production
10.1061/(ASCE)CO.1943-7862.0000798
Saved in:
Main Authors: | Khalili, A., Chua, D.K. |
---|---|
Other Authors: | CIVIL & ENVIRONMENTAL ENGINEERING |
Format: | Article |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/91033 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
An IFC-based framework for optimizing prefabrication configurations
by: Khalili, A., et al.
Published: (2014) -
Instance-specific algorithm configuration via unsupervised deep graph clustering
by: SONG, Wen, et al.
Published: (2023) -
The integrated yard truck and yard crane scheduling problem: Benders' decomposition-based methods
by: Cao, J.X., et al.
Published: (2014) -
On the long-term wireless network deployment strategies
by: WU QI MING
Published: (2010) -
Joint pricing and matching for city-scale ride pooling
by: SHAH, Sanket, et al.
Published: (2022)