Quay crane scheduling for an indented berth
10.1080/0305215X.2010.532551
Saved in:
Main Authors: | Lee, D.-H., Chen, J.H., Cao, J.X. |
---|---|
Other Authors: | CIVIL & ENVIRONMENTAL ENGINEERING |
Format: | Article |
Published: |
2014
|
Subjects: | |
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/91163 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Quay crane scheduling for an indented berth
by: Lee, D.-H., et al.
Published: (2014) -
Heuristics for quay crane scheduling at indented berth
by: Chen, J.H., et al.
Published: (2014) -
Heuristics for quay crane scheduling at indented berth
by: Chen, J.H., et al.
Published: (2014) -
Integrated discrete berth allocation and quay crane scheduling in port container terminals
by: Lee, D.-H., et al.
Published: (2014) -
Berth allocation and quay crane scheduling in port container terminals
by: WANG HUIQIU
Published: (2010)