Life-cycle financial modelling of long term infrastructure projects "PPP-BOT projects" under uncertainty and risk
Life-Cycle and Sustainability of Civil Infrastructure Systems - Proceedings of the 3rd International Symposium on Life-Cycle Civil Engineering, IALCCE 2012
Saved in:
Main Authors: | Attarzadeh, M., Chua, D.K.H., Zhu, L., Beer, M. |
---|---|
Other Authors: | CIVIL & ENVIRONMENTAL ENGINEERING |
Format: | Conference or Workshop Item |
Published: |
2014
|
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/91304 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Life-cycle financial modelling of long term infrastructure projects "PPP-BOT projects" under uncertainty and risk
by: Attarzadeh, M., et al.
Published: (2014) -
Risk management of Long Term Infrastructure Projects "PPP-BOT projects" by using Uncertainty, Probabilistic and Stochastic Methods and Models
by: Attarzadeh, M., et al.
Published: (2014) -
Risk management of Long Term Infrastructure Projects "PPP-BOT projects" by using Uncertainty, Probabilistic and Stochastic Methods and Models
by: Attarzadeh, M., et al.
Published: (2014) -
Options-based negotiation management of PPP?BOT infrastructure projects
by: Meghdad Attarzadeh, et al.
Published: (2018) -
NEGOTIATION-BASED RISK MANAGEMENT FOR PPP-BOT INFRASTRUCTURE PROJECTS
by: MEGHDAD ATTARZADEH
Published: (2015)