Risk management of Long Term Infrastructure Projects "PPP-BOT projects" by using Uncertainty, Probabilistic and Stochastic Methods and Models

10.1061/41170(400)44

Saved in:
Bibliographic Details
Main Authors: Attarzadeh, M., Chua, D.K.H., Beer, M.
Other Authors: CIVIL & ENVIRONMENTAL ENGINEERING
Format: Conference or Workshop Item
Published: 2014
Subjects:
Ppp
Online Access:http://scholarbank.nus.edu.sg/handle/10635/91331
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: National University of Singapore
id sg-nus-scholar.10635-91331
record_format dspace
spelling sg-nus-scholar.10635-913312015-01-08T12:32:50Z Risk management of Long Term Infrastructure Projects "PPP-BOT projects" by using Uncertainty, Probabilistic and Stochastic Methods and Models Attarzadeh, M. Chua, D.K.H. Beer, M. CIVIL & ENVIRONMENTAL ENGINEERING Construction project simulation Dependability modeling under uncertainty Fuzzy set Monte carlo simulation Ppp Probabilistic methods Risk management 10.1061/41170(400)44 Vulnerability, Uncertainty, and Risk: Analysis, Modeling, and Management - Proceedings of the ICVRAM 2011 and ISUMA 2011 Conferences 360-367 2014-10-09T07:40:43Z 2014-10-09T07:40:43Z 2011 Conference Paper Attarzadeh, M.,Chua, D.K.H.,Beer, M. (2011). Risk management of Long Term Infrastructure Projects "PPP-BOT projects" by using Uncertainty, Probabilistic and Stochastic Methods and Models. Vulnerability, Uncertainty, and Risk: Analysis, Modeling, and Management - Proceedings of the ICVRAM 2011 and ISUMA 2011 Conferences : 360-367. ScholarBank@NUS Repository. <a href="https://doi.org/10.1061/41170(400)44" target="_blank">https://doi.org/10.1061/41170(400)44</a> 9780784411704 http://scholarbank.nus.edu.sg/handle/10635/91331 NOT_IN_WOS Scopus
institution National University of Singapore
building NUS Library
country Singapore
collection ScholarBank@NUS
topic Construction project simulation
Dependability modeling under uncertainty
Fuzzy set
Monte carlo simulation
Ppp
Probabilistic methods
Risk management
spellingShingle Construction project simulation
Dependability modeling under uncertainty
Fuzzy set
Monte carlo simulation
Ppp
Probabilistic methods
Risk management
Attarzadeh, M.
Chua, D.K.H.
Beer, M.
Risk management of Long Term Infrastructure Projects "PPP-BOT projects" by using Uncertainty, Probabilistic and Stochastic Methods and Models
description 10.1061/41170(400)44
author2 CIVIL & ENVIRONMENTAL ENGINEERING
author_facet CIVIL & ENVIRONMENTAL ENGINEERING
Attarzadeh, M.
Chua, D.K.H.
Beer, M.
format Conference or Workshop Item
author Attarzadeh, M.
Chua, D.K.H.
Beer, M.
author_sort Attarzadeh, M.
title Risk management of Long Term Infrastructure Projects "PPP-BOT projects" by using Uncertainty, Probabilistic and Stochastic Methods and Models
title_short Risk management of Long Term Infrastructure Projects "PPP-BOT projects" by using Uncertainty, Probabilistic and Stochastic Methods and Models
title_full Risk management of Long Term Infrastructure Projects "PPP-BOT projects" by using Uncertainty, Probabilistic and Stochastic Methods and Models
title_fullStr Risk management of Long Term Infrastructure Projects "PPP-BOT projects" by using Uncertainty, Probabilistic and Stochastic Methods and Models
title_full_unstemmed Risk management of Long Term Infrastructure Projects "PPP-BOT projects" by using Uncertainty, Probabilistic and Stochastic Methods and Models
title_sort risk management of long term infrastructure projects "ppp-bot projects" by using uncertainty, probabilistic and stochastic methods and models
publishDate 2014
url http://scholarbank.nus.edu.sg/handle/10635/91331
_version_ 1681090750956175360