Resource-Constrained Scheduling of Parallel Production Lines Using Asynchronous Slots
Industrial and Engineering Chemistry Research
Saved in:
Main Authors: | , |
---|---|
Other Authors: | |
Format: | Article |
Published: |
2014
|
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/92307 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
id |
sg-nus-scholar.10635-92307 |
---|---|
record_format |
dspace |
spelling |
sg-nus-scholar.10635-923072015-01-09T06:58:10Z Resource-Constrained Scheduling of Parallel Production Lines Using Asynchronous Slots Lim, M.-F. Karimi, I.A. CHEMICAL & ENVIRONMENTAL ENGINEERING Industrial and Engineering Chemistry Research 42 26 6832-6842 IECRE 2014-10-09T10:00:06Z 2014-10-09T10:00:06Z 2003-12-24 Article Lim, M.-F.,Karimi, I.A. (2003-12-24). Resource-Constrained Scheduling of Parallel Production Lines Using Asynchronous Slots. Industrial and Engineering Chemistry Research 42 (26) : 6832-6842. ScholarBank@NUS Repository. 08885885 http://scholarbank.nus.edu.sg/handle/10635/92307 NOT_IN_WOS Scopus |
institution |
National University of Singapore |
building |
NUS Library |
country |
Singapore |
collection |
ScholarBank@NUS |
description |
Industrial and Engineering Chemistry Research |
author2 |
CHEMICAL & ENVIRONMENTAL ENGINEERING |
author_facet |
CHEMICAL & ENVIRONMENTAL ENGINEERING Lim, M.-F. Karimi, I.A. |
format |
Article |
author |
Lim, M.-F. Karimi, I.A. |
spellingShingle |
Lim, M.-F. Karimi, I.A. Resource-Constrained Scheduling of Parallel Production Lines Using Asynchronous Slots |
author_sort |
Lim, M.-F. |
title |
Resource-Constrained Scheduling of Parallel Production Lines Using Asynchronous Slots |
title_short |
Resource-Constrained Scheduling of Parallel Production Lines Using Asynchronous Slots |
title_full |
Resource-Constrained Scheduling of Parallel Production Lines Using Asynchronous Slots |
title_fullStr |
Resource-Constrained Scheduling of Parallel Production Lines Using Asynchronous Slots |
title_full_unstemmed |
Resource-Constrained Scheduling of Parallel Production Lines Using Asynchronous Slots |
title_sort |
resource-constrained scheduling of parallel production lines using asynchronous slots |
publishDate |
2014 |
url |
http://scholarbank.nus.edu.sg/handle/10635/92307 |
_version_ |
1681090924496551936 |