Scheduling parallel production lines with resource constraints. 1. Model formulation

Industrial and Engineering Chemistry Research

Saved in:
Bibliographic Details
Main Authors: Lamba, N., Karimi, I.A.
Other Authors: CHEMICAL & ENVIRONMENTAL ENGINEERING
Format: Article
Published: 2014
Online Access:http://scholarbank.nus.edu.sg/handle/10635/92319
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: National University of Singapore
id sg-nus-scholar.10635-92319
record_format dspace
spelling sg-nus-scholar.10635-923192015-02-07T02:59:52Z Scheduling parallel production lines with resource constraints. 1. Model formulation Lamba, N. Karimi, I.A. CHEMICAL & ENVIRONMENTAL ENGINEERING Industrial and Engineering Chemistry Research 41 4 779-789 IECRE 2014-10-09T10:00:20Z 2014-10-09T10:00:20Z 2002-02-20 Article Lamba, N.,Karimi, I.A. (2002-02-20). Scheduling parallel production lines with resource constraints. 1. Model formulation. Industrial and Engineering Chemistry Research 41 (4) : 779-789. ScholarBank@NUS Repository. 08885885 http://scholarbank.nus.edu.sg/handle/10635/92319 NOT_IN_WOS Scopus
institution National University of Singapore
building NUS Library
country Singapore
collection ScholarBank@NUS
description Industrial and Engineering Chemistry Research
author2 CHEMICAL & ENVIRONMENTAL ENGINEERING
author_facet CHEMICAL & ENVIRONMENTAL ENGINEERING
Lamba, N.
Karimi, I.A.
format Article
author Lamba, N.
Karimi, I.A.
spellingShingle Lamba, N.
Karimi, I.A.
Scheduling parallel production lines with resource constraints. 1. Model formulation
author_sort Lamba, N.
title Scheduling parallel production lines with resource constraints. 1. Model formulation
title_short Scheduling parallel production lines with resource constraints. 1. Model formulation
title_full Scheduling parallel production lines with resource constraints. 1. Model formulation
title_fullStr Scheduling parallel production lines with resource constraints. 1. Model formulation
title_full_unstemmed Scheduling parallel production lines with resource constraints. 1. Model formulation
title_sort scheduling parallel production lines with resource constraints. 1. model formulation
publishDate 2014
url http://scholarbank.nus.edu.sg/handle/10635/92319
_version_ 1681090926681784320