Knowledge-based factory scheduling: Resource allocation and constraint satisfaction
Expert Systems With Applications
Saved in:
Main Author: | Liu, B. |
---|---|
Other Authors: | INFORMATION SYSTEMS & COMPUTER SCIENCE |
Format: | Article |
Published: |
2014
|
Online Access: | http://scholarbank.nus.edu.sg/handle/10635/99321 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | National University of Singapore |
Similar Items
-
Integrated resource allocation and scheduling in a bidirectional flowshop with multimachine and COS constraints
by: Zhao, Z.Y.J., et al.
Published: (2014) -
Integrated Resource Allocation and Scheduling in Bidirectional Flow Shop with Multi-Machine and COS Constraints
by: LAU, Hoong Chuin, et al.
Published: (2009) -
EVOLVING CONSTRUCTION SCHEDULES UNDER RESOURCE CONSTRAINTS
by: KANNAN GOVINDAN
Published: (2020) -
Optimal allocation of minimal and perfect repairs under resource constraints
by: Cui, L., et al.
Published: (2014) -
Optimal allocation of minimal and perfect repairs under resource constraints
by: Cui, L., et al.
Published: (2014)