Single Machine Scheduling with Deadlines and Increasing Rates of Processing Times
The makespan, flow time and maximum lateness problems of scheduling a set of tasks with deadlines and increasing rates of processing times on a single machine are considered in this paper. We first show that, when the increasing rates of processing time are identical, the makespan problem is equival...
Saved in:
Main Authors: | , |
---|---|
格式: | text |
語言: | English |
出版: |
Institutional Knowledge at Singapore Management University
2000
|
主題: | |
在線閱讀: | https://ink.library.smu.edu.sg/lkcsb_research/873 https://doi.org/10.1007/s002360050170 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | Singapore Management University |
語言: | English |
成為第一個發表評論!