Staggering Periodic Replenishment in Multivendor JIT Environments
The delivery scheduling problem studied in this paper was motivated by the operation in a large personal computer assembly plant, which was using multisourcing for some of its materials. The company's objective was to design a delivery schedule so that the average inventory level in the factory...
Saved in:
Main Authors: | , , |
---|---|
Format: | text |
Language: | English |
Published: |
Institutional Knowledge at Singapore Management University
2005
|
Subjects: | |
Online Access: | https://ink.library.smu.edu.sg/lkcsb_research/884 https://doi.org/10.1287/opre.1040.0196 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Singapore Management University |
Language: | English |
Be the first to leave a comment!