On a Continuous Review Production-Inventory Problem

This paper considers a one-product, one-machine production-inventory problem operating under an (s, S) policy. The production facility may be set up and in production, shut down and idle or failed and under repair. Back-order is not permitted. By identifying a semi-regenerative process, expressions...

Full description

Saved in:
Bibliographic Details
Main Author: MOOSA, Sharafali
Format: text
Language:English
Published: Institutional Knowledge at Singapore Management University 1984
Subjects:
Online Access:https://ink.library.smu.edu.sg/lkcsb_research/905
https://doi.org/10.1016/0167-6377(84)90026-9
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Singapore Management University
Language: English
Description
Summary:This paper considers a one-product, one-machine production-inventory problem operating under an (s, S) policy. The production facility may be set up and in production, shut down and idle or failed and under repair. Back-order is not permitted. By identifying a semi-regenerative process, expressions for the probability mass function for the inventory process at any time and in the stationary regime are obtained. The distribution for the total duration of idleness of the machine upto any time is derived. Cost analysis is also indicated.