Coping with Uncertainty in Kanban-Controlled Production Systems
Saved in:
Main Authors: | MOOSA, Sharafali, Co, H. C. |
---|---|
Format: | text |
Language: | English |
Published: |
Institutional Knowledge at Singapore Management University
1995
|
Subjects: | |
Online Access: | https://ink.library.smu.edu.sg/lkcsb_research/925 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Singapore Management University |
Language: | English |
Similar Items
-
Overplanning Factor in Toyota's Formula for Computing the Number of Kanban
by: CO, Henry C., et al.
Published: (1997) -
The Impact of Mean Flow Time When Operating a Flexible Manufacturing System as a Programmable Transfer Line
by: CO, H. C., et al.
Published: (1999) -
Some Models for Understanding the Incentives for Supply Chain Collaboration
by: CO, H. C., et al.
Published: (2002) -
How Good Is the Estimate of Stock-out Cost in Inventory Control?
by: MOOSA, Sharafali, et al.
Published: (2005) -
A Note on Scheduling Part Families in Fms: Is It Always Good to Operate the Fms as a Job Shop?
by: CO, H. C., et al.
Published: (1999)