Reducing Cycle Time at an IBM Wafer Fabrication Facility

In 1991, IBM San Jose decided to produce and sell magnetic heads for computer disk drives on the open market to original equipment manufacturers. However, as IBM's wafer fabrication facility increased the number of products it manufactured, its manufacturing cycle time lengthened. Since cycle t...

Full description

Saved in:
Bibliographic Details
Main Authors: DEMEESTER, Lieven, TANG, Christopher S.
Format: text
Language:English
Published: Institutional Knowledge at Singapore Management University 1996
Subjects:
Online Access:https://ink.library.smu.edu.sg/lkcsb_research/1064
https://ink.library.smu.edu.sg/context/lkcsb_research/article/2063/viewcontent/ReducingCycleTimeIBMWafer_1999.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Singapore Management University
Language: English
id sg-smu-ink.lkcsb_research-2063
record_format dspace
spelling sg-smu-ink.lkcsb_research-20632017-09-19T07:14:37Z Reducing Cycle Time at an IBM Wafer Fabrication Facility DEMEESTER, Lieven TANG, Christopher S. In 1991, IBM San Jose decided to produce and sell magnetic heads for computer disk drives on the open market to original equipment manufacturers. However, as IBM's wafer fabrication facility increased the number of products it manufactured, its manufacturing cycle time lengthened. Since cycle time is important in competing in the open market, IBM San Jose formed a study team (in cooperation with UCLA) to examine the wafer fab and to develop ways to reduce cycle time. The team designed a new production control system and proposed new performance measures for operators and engineers. IBM implemented the new production control system and established the performance measures in June 1992, and the cycle time decreased by 50 percent by the end of 1992. 1996-03-01T08:00:00Z text application/pdf https://ink.library.smu.edu.sg/lkcsb_research/1064 info:doi/10.1287/inte.26.2.34 https://ink.library.smu.edu.sg/context/lkcsb_research/article/2063/viewcontent/ReducingCycleTimeIBMWafer_1999.pdf http://creativecommons.org/licenses/by-nc-nd/4.0/ Research Collection Lee Kong Chian School Of Business eng Institutional Knowledge at Singapore Management University High technology industries production scheduling Flow shop Business Operations and Supply Chain Management Technology and Innovation
institution Singapore Management University
building SMU Libraries
continent Asia
country Singapore
Singapore
content_provider SMU Libraries
collection InK@SMU
language English
topic High technology industries
production scheduling
Flow shop
Business
Operations and Supply Chain Management
Technology and Innovation
spellingShingle High technology industries
production scheduling
Flow shop
Business
Operations and Supply Chain Management
Technology and Innovation
DEMEESTER, Lieven
TANG, Christopher S.
Reducing Cycle Time at an IBM Wafer Fabrication Facility
description In 1991, IBM San Jose decided to produce and sell magnetic heads for computer disk drives on the open market to original equipment manufacturers. However, as IBM's wafer fabrication facility increased the number of products it manufactured, its manufacturing cycle time lengthened. Since cycle time is important in competing in the open market, IBM San Jose formed a study team (in cooperation with UCLA) to examine the wafer fab and to develop ways to reduce cycle time. The team designed a new production control system and proposed new performance measures for operators and engineers. IBM implemented the new production control system and established the performance measures in June 1992, and the cycle time decreased by 50 percent by the end of 1992.
format text
author DEMEESTER, Lieven
TANG, Christopher S.
author_facet DEMEESTER, Lieven
TANG, Christopher S.
author_sort DEMEESTER, Lieven
title Reducing Cycle Time at an IBM Wafer Fabrication Facility
title_short Reducing Cycle Time at an IBM Wafer Fabrication Facility
title_full Reducing Cycle Time at an IBM Wafer Fabrication Facility
title_fullStr Reducing Cycle Time at an IBM Wafer Fabrication Facility
title_full_unstemmed Reducing Cycle Time at an IBM Wafer Fabrication Facility
title_sort reducing cycle time at an ibm wafer fabrication facility
publisher Institutional Knowledge at Singapore Management University
publishDate 1996
url https://ink.library.smu.edu.sg/lkcsb_research/1064
https://ink.library.smu.edu.sg/context/lkcsb_research/article/2063/viewcontent/ReducingCycleTimeIBMWafer_1999.pdf
_version_ 1770569771555749888