Reducing Cycle Time at an IBM Wafer Fabrication Facility

In 1991, IBM San Jose decided to produce and sell magnetic heads for computer disk drives on the open market to original equipment manufacturers. However, as IBM's wafer fabrication facility increased the number of products it manufactured, its manufacturing cycle time lengthened. Since cycle t...

全面介紹

Saved in:
書目詳細資料
Main Authors: DEMEESTER, Lieven, TANG, Christopher S.
格式: text
語言:English
出版: Institutional Knowledge at Singapore Management University 1996
主題:
在線閱讀:https://ink.library.smu.edu.sg/lkcsb_research/1064
https://ink.library.smu.edu.sg/context/lkcsb_research/article/2063/viewcontent/ReducingCycleTimeIBMWafer_1999.pdf
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!