Optimal Portfolios with Estimation Risk: The Singapore Case
Saved in:
Main Authors: | Hui, T.K., Kwan, K.C, Yang, Kum Khiong |
---|---|
Format: | text |
Language: | English |
Published: |
Institutional Knowledge at Singapore Management University
1987
|
Subjects: | |
Online Access: | https://ink.library.smu.edu.sg/lkcsb_research/2021 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Singapore Management University |
Language: | English |
Similar Items
-
Effects of Erroneous Estimation of Activity Durations on Scheduling and Dispatching a Single Project
by: Yang, Kum Khiong
Published: (1996) -
Tail mean-variance portfolio selection with estimation risk
by: Huang, Zhenzhen, et al.
Published: (2024) -
A Comparison of Dispatching Rules for Executing a Resource-Constrained Project with Estimated Activity Durations
by: Yang, Kum Khiong
Published: (1998) -
Analysis of portfolio optimization model.
by: Ng, Sze Sze., et al.
Published: (2008) -
Optimal portfolio size for portfolio diversification : an empirical study on Singapore Stock Exchange.
by: Chong, Wai Lam., et al.
Published: (2011)