A Comparison of Resource Allocation and Activity Scheduling Rules in a Dynamic Multi-Project Environment

The use of a dual-level structure in managing the use of resources in a multi-project environment involves 2 sets of decisions. Resource allocation decisions, usually controlled by a central authority, determine the allocation of resources among projects such that resources are allocated to the crit...

Full description

Saved in:
Bibliographic Details
Main Authors: Yang, Kum Khiong, Sum, C. C.
Format: text
Language:English
Published: Institutional Knowledge at Singapore Management University 1993
Subjects:
Online Access:https://ink.library.smu.edu.sg/lkcsb_research/2231
https://proquest.umi.com/pqdlink?did=1178847&sid=15&Fmt=2&clientId=44274&RQT=309&VName=PQD
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Singapore Management University
Language: English
id sg-smu-ink.lkcsb_research-3230
record_format dspace
spelling sg-smu-ink.lkcsb_research-32302010-09-23T12:30:04Z A Comparison of Resource Allocation and Activity Scheduling Rules in a Dynamic Multi-Project Environment Yang, Kum Khiong Sum, C. C. The use of a dual-level structure in managing the use of resources in a multi-project environment involves 2 sets of decisions. Resource allocation decisions, usually controlled by a central authority, determine the allocation of resources among projects such that resources are allocated to the critical projects. Once assigned to a project, the resources are managed by an independent project manager who schedules the activities within his project using only the resources assigned to him. Analysis is presented of the relative performance of 4 resource allocation priority rules and 6 resource transfer rules in conjunction with 2 activity scheduling rules. The results show that the first in system first served resource allocation priority rule dominates over the other 3 proposed resource allocation priority rules with the lowest project tardiness, flowtime, and lateness standard deviation. The minimum late finish activity scheduling rule is shown to perform better than the minimum slack activity scheduling rule. 1993-01-01T08:00:00Z text https://ink.library.smu.edu.sg/lkcsb_research/2231 info:doi/10.1016/0272-6963(93)90023-I https://proquest.umi.com/pqdlink?did=1178847&sid=15&Fmt=2&clientId=44274&RQT=309&VName=PQD Research Collection Lee Kong Chian School Of Business eng Institutional Knowledge at Singapore Management University Business
institution Singapore Management University
building SMU Libraries
continent Asia
country Singapore
Singapore
content_provider SMU Libraries
collection InK@SMU
language English
topic Business
spellingShingle Business
Yang, Kum Khiong
Sum, C. C.
A Comparison of Resource Allocation and Activity Scheduling Rules in a Dynamic Multi-Project Environment
description The use of a dual-level structure in managing the use of resources in a multi-project environment involves 2 sets of decisions. Resource allocation decisions, usually controlled by a central authority, determine the allocation of resources among projects such that resources are allocated to the critical projects. Once assigned to a project, the resources are managed by an independent project manager who schedules the activities within his project using only the resources assigned to him. Analysis is presented of the relative performance of 4 resource allocation priority rules and 6 resource transfer rules in conjunction with 2 activity scheduling rules. The results show that the first in system first served resource allocation priority rule dominates over the other 3 proposed resource allocation priority rules with the lowest project tardiness, flowtime, and lateness standard deviation. The minimum late finish activity scheduling rule is shown to perform better than the minimum slack activity scheduling rule.
format text
author Yang, Kum Khiong
Sum, C. C.
author_facet Yang, Kum Khiong
Sum, C. C.
author_sort Yang, Kum Khiong
title A Comparison of Resource Allocation and Activity Scheduling Rules in a Dynamic Multi-Project Environment
title_short A Comparison of Resource Allocation and Activity Scheduling Rules in a Dynamic Multi-Project Environment
title_full A Comparison of Resource Allocation and Activity Scheduling Rules in a Dynamic Multi-Project Environment
title_fullStr A Comparison of Resource Allocation and Activity Scheduling Rules in a Dynamic Multi-Project Environment
title_full_unstemmed A Comparison of Resource Allocation and Activity Scheduling Rules in a Dynamic Multi-Project Environment
title_sort comparison of resource allocation and activity scheduling rules in a dynamic multi-project environment
publisher Institutional Knowledge at Singapore Management University
publishDate 1993
url https://ink.library.smu.edu.sg/lkcsb_research/2231
https://proquest.umi.com/pqdlink?did=1178847&sid=15&Fmt=2&clientId=44274&RQT=309&VName=PQD
_version_ 1770570182680379392