A Comparison of Resource Allocation and Activity Scheduling Rules in a Dynamic Multi-Project Environment
The use of a dual-level structure in managing the use of resources in a multi-project environment involves 2 sets of decisions. Resource allocation decisions, usually controlled by a central authority, determine the allocation of resources among projects such that resources are allocated to the crit...
Saved in:
Main Authors: | , |
---|---|
Format: | text |
Language: | English |
Published: |
Institutional Knowledge at Singapore Management University
1993
|
Subjects: | |
Online Access: | https://ink.library.smu.edu.sg/lkcsb_research/2231 https://proquest.umi.com/pqdlink?did=1178847&sid=15&Fmt=2&clientId=44274&RQT=309&VName=PQD |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Singapore Management University |
Language: | English |
id |
sg-smu-ink.lkcsb_research-3230 |
---|---|
record_format |
dspace |
spelling |
sg-smu-ink.lkcsb_research-32302010-09-23T12:30:04Z A Comparison of Resource Allocation and Activity Scheduling Rules in a Dynamic Multi-Project Environment Yang, Kum Khiong Sum, C. C. The use of a dual-level structure in managing the use of resources in a multi-project environment involves 2 sets of decisions. Resource allocation decisions, usually controlled by a central authority, determine the allocation of resources among projects such that resources are allocated to the critical projects. Once assigned to a project, the resources are managed by an independent project manager who schedules the activities within his project using only the resources assigned to him. Analysis is presented of the relative performance of 4 resource allocation priority rules and 6 resource transfer rules in conjunction with 2 activity scheduling rules. The results show that the first in system first served resource allocation priority rule dominates over the other 3 proposed resource allocation priority rules with the lowest project tardiness, flowtime, and lateness standard deviation. The minimum late finish activity scheduling rule is shown to perform better than the minimum slack activity scheduling rule. 1993-01-01T08:00:00Z text https://ink.library.smu.edu.sg/lkcsb_research/2231 info:doi/10.1016/0272-6963(93)90023-I https://proquest.umi.com/pqdlink?did=1178847&sid=15&Fmt=2&clientId=44274&RQT=309&VName=PQD Research Collection Lee Kong Chian School Of Business eng Institutional Knowledge at Singapore Management University Business |
institution |
Singapore Management University |
building |
SMU Libraries |
continent |
Asia |
country |
Singapore Singapore |
content_provider |
SMU Libraries |
collection |
InK@SMU |
language |
English |
topic |
Business |
spellingShingle |
Business Yang, Kum Khiong Sum, C. C. A Comparison of Resource Allocation and Activity Scheduling Rules in a Dynamic Multi-Project Environment |
description |
The use of a dual-level structure in managing the use of resources in a multi-project environment involves 2 sets of decisions. Resource allocation decisions, usually controlled by a central authority, determine the allocation of resources among projects such that resources are allocated to the critical projects. Once assigned to a project, the resources are managed by an independent project manager who schedules the activities within his project using only the resources assigned to him. Analysis is presented of the relative performance of 4 resource allocation priority rules and 6 resource transfer rules in conjunction with 2 activity scheduling rules. The results show that the first in system first served resource allocation priority rule dominates over the other 3 proposed resource allocation priority rules with the lowest project tardiness, flowtime, and lateness standard deviation. The minimum late finish activity scheduling rule is shown to perform better than the minimum slack activity scheduling rule. |
format |
text |
author |
Yang, Kum Khiong Sum, C. C. |
author_facet |
Yang, Kum Khiong Sum, C. C. |
author_sort |
Yang, Kum Khiong |
title |
A Comparison of Resource Allocation and Activity Scheduling Rules in a Dynamic Multi-Project Environment |
title_short |
A Comparison of Resource Allocation and Activity Scheduling Rules in a Dynamic Multi-Project Environment |
title_full |
A Comparison of Resource Allocation and Activity Scheduling Rules in a Dynamic Multi-Project Environment |
title_fullStr |
A Comparison of Resource Allocation and Activity Scheduling Rules in a Dynamic Multi-Project Environment |
title_full_unstemmed |
A Comparison of Resource Allocation and Activity Scheduling Rules in a Dynamic Multi-Project Environment |
title_sort |
comparison of resource allocation and activity scheduling rules in a dynamic multi-project environment |
publisher |
Institutional Knowledge at Singapore Management University |
publishDate |
1993 |
url |
https://ink.library.smu.edu.sg/lkcsb_research/2231 https://proquest.umi.com/pqdlink?did=1178847&sid=15&Fmt=2&clientId=44274&RQT=309&VName=PQD |
_version_ |
1770570182680379392 |