Solving a Crane Scheduling Problem Using Intelligent Search Schemes
Cranes are central to port operations where cargo throughput and port efficiency is often determined by how well loading and unloading is performed. In ports, the effectiveness of any logistics management system which includes operating cranes is often impacted by pressures of limited port size, hig...
Saved in:
Main Authors: | LIM, Andrew, RODRIGUES, Brian, XU, Zhou |
---|---|
Format: | text |
Language: | English |
Published: |
Institutional Knowledge at Singapore Management University
2004
|
Subjects: | |
Online Access: | https://ink.library.smu.edu.sg/lkcsb_research/2381 https://doi.org/10.1007/978-3-540-30201-8_59 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Singapore Management University |
Language: | English |
Similar Items
-
Approximation Schemes for the Crane Scheduling Problem
by: LIM, Andrew, et al.
Published: (2004) -
Crane Scheduling Using Tabu Search
by: LIM, Andrew, et al.
Published: (2002) -
Crane Scheduling using SWO with Local Search
by: LIM, Andrew, et al.
Published: (2002) -
A m-Parallel Crane Scheduling Problem with a Non-Crossing Constraint
by: LIM, Andrew, et al.
Published: (2007) -
Aircraft and Gate Scheduling with Time Windows
by: ZHU, Yi, et al.
Published: (2003)