A Hybrid Framework for Over-Constrained Generalized Resource-Constrained Project Scheduling Problems
In this work we study an over-constrained scheduling problem where constraints cannot be relaxed. This problem originates from a local defense agency where activities to be scheduled are strongly ranked in a priority scheme determined by planners ahead of time and operational real-time demands requi...
Saved in:
Main Authors: | LIM, Andrew, Rodrigues, Brian, Thangarajoo, R., Xiao, F. |
---|---|
Format: | text |
Language: | English |
Published: |
Institutional Knowledge at Singapore Management University
2010
|
Subjects: | |
Online Access: | https://ink.library.smu.edu.sg/lkcsb_research/2814 https://doi.org/10.1007/s10462-004-1286-8 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Singapore Management University |
Language: | English |
Similar Items
-
New Meta-heuristics for the Resource-constrained Project Scheduling Problem
by: LIM, Andrew, et al.
Published: (2013) -
New meta-heuristics for the resource-constrained project scheduling problem
by: Lim, A., et al.
Published: (2013) -
The Over-Constrained Airport Gate Assignment Problem
by: DING, Huping, et al.
Published: (2005) -
Airport Gate Scheduling with Time Windows
by: LIM, Andrew, et al.
Published: (2005) -
Over-Constrained Resource-Constrained Scheduling Problems with Prioritized Activities
by: LIM, Andrew, et al.
Published: (2002)