A branch-and-bound procedure for the resource-constrained project scheduling problem with generalized precedence relations
We present an optimal solution procedure for the resource-constrained project scheduling problem (RCPSP) with generalized precedence relations (RCPSP-GPR) with the objective of minimizing the project makespan. The RCPSPGPR extends the RCPSP to arbitrary minimal and maximal time lags between the star...
محفوظ في:
المؤلفون الرئيسيون: | , |
---|---|
التنسيق: | text |
اللغة: | English |
منشور في: |
Institutional Knowledge at Singapore Management University
1998
|
الموضوعات: | |
الوصول للمادة أونلاين: | https://ink.library.smu.edu.sg/lkcsb_research/6742 https://ink.library.smu.edu.sg/context/lkcsb_research/article/7763/viewcontent/1_s2.0_S0377221797003056_main.pdf |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
المؤسسة: | Singapore Management University |
اللغة: | English |