On setting the delivery due date with production on a machine under outsourced maintenance

We consider an unreliable production system with a contractual relationship with a customer for a firm delivery date. We focus on the production-related decisions of the manufacturer. We assume that production rate is constant as long as the system is up and running but the randomness in production...

وصف كامل

محفوظ في:
التفاصيل البيبلوغرافية
المؤلفون الرئيسيون: MOOSA, Sharafali, TARAKCI, Hakan., KULKARNI, Shailesh, Shahul Hameed, Raja Abdul Razack
التنسيق: text
اللغة:English
منشور في: Institutional Knowledge at Singapore Management University 2017
الموضوعات:
الوصول للمادة أونلاين:https://ink.library.smu.edu.sg/lkcsb_research_all/11
https://ink.library.smu.edu.sg/cgi/viewcontent.cgi?article=1016&context=lkcsb_research_all
الوسوم: إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
المؤسسة: Singapore Management University
اللغة: English
الوصف
الملخص:We consider an unreliable production system with a contractual relationship with a customer for a firm delivery date. We focus on the production-related decisions of the manufacturer. We assume that production rate is constant as long as the system is up and running but the randomness in production is due to downtimes as a result of breakdowns and scheduled preventive maintenance activities. The maintenance of the production facility is outsourced to a contractor. As production output is random, the manufacturer needs to make two important decisions, viz (i) how much time to allow for production taking into account the trade-off between the penalty fee if actual production time turns out to be longer than the deadline and the inventory holding cost if the production time is shorter than the allowed time and (ii) how to design the maintenance outsourcing contract to maximize its own profit while satisfying the contractor's reservation (minimum) profit requirements. This is a finite horizon optimization problem. A regenerative stochastic process is identified and analysed to develop the cost function over the finite horizon. The optimization problem will be illustrated through numerical examples. Some managerial insights with regard to coordination and some extensions will also be provided.