A heuristic method for job-shop scheduling with an infinite wait buffer: From one-machine to multi-machine problems
Through empirical comparison of classical job shop problems (JSP) with multi-machine consideration, we find that the objective to minimize the sum of weighted tardiness has a better wait property compared with the objective to minimize the makespan. Further, we test the proposed Iterative Minimizati...
Saved in:
Main Authors: | , , , , |
---|---|
格式: | text |
語言: | English |
出版: |
Institutional Knowledge at Singapore Management University
2008
|
主題: | |
在線閱讀: | https://ink.library.smu.edu.sg/sis_research/554 https://ink.library.smu.edu.sg/context/sis_research/article/1553/viewcontent/HeuristicMethodJobShopScheduling_2008_CIS.pdf |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|