Generation maintenance scheduling for multi-are a system with transmission constraints

This paper presents results of modeling and solving a maintenance scheduling problem of generating units for multi-area power system using hybrid constraint programming (CP) and mathematical programming (MP) method. The problem model is implemented in the optimization programming language (OPL). The...

Full description

Saved in:
Bibliographic Details
Main Authors: Watcharaporn A., Tayati W.
Format: Conference or Workshop Item
Language:English
Published: 2014
Online Access:http://www.scopus.com/inward/record.url?eid=2-s2.0-1442278703&partnerID=40&md5=6f6a6b5b2d910f0aac535240c3b5268b
http://cmuir.cmu.ac.th/handle/6653943832/1424
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Chiang Mai University
Language: English
Be the first to leave a comment!
You must be logged in first