Key indicators for maintenance performance measurement: The aircraft galley and associated equipment manufacturer case study
The aim of this research was to develop a maintenance performance measurement model, based on three main steps, these being: (1) identify and screen factors affecting maintenance performance, (2) identify relevant key indicators for the measurement of maintenance performance, and (3) apply those key...
Saved in:
Main Authors: | Chompu-Inwai R., Diaotrakun R., Thaiupathump T. |
---|---|
Format: | Conference or Workshop Item |
Language: | English |
Published: |
2014
|
Online Access: | http://www.scopus.com/inward/record.url?eid=2-s2.0-84885395799&partnerID=40&md5=e80f3696d17c0c68ffa6111c5e4e357b http://cmuir.cmu.ac.th/handle/6653943832/1647 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Chiang Mai University |
Language: | English |
Similar Items
-
Key indicators for maintenance performance measurement: The aircraft galley and associated equipment manufacturer case study
by: Rungchat Chompu-Inwai, et al.
Published: (2018) -
Key indicators for maintenance performance measurement: The aircraft galley and associated equipment manufacturer case study
by: Rungchat Chompu-Inwai, et al.
Published: (2018) -
Key performance indicators for measuring contractors' performance
by: Ling, F.Y.Y., et al.
Published: (2013) -
A two-stage equipment predictive maintenance framework for high-performance manufacturing systems
by: Hu, B., et al.
Published: (2014) -
Evaluation of MTTR variable as a key indicator of maintenance achievement to retain the network performance
by: , SUGIANTO, Johanes Purwo, et al.
Published: (2005)