Recent upgrade of the PITZ facility
The Photo Injector Test facility at DESY, Zeuthen site (PITZ), is dedicated to develop and optimize high brightness electron sources for short wavelength Free-Electron Lasers (FELs) like FLASH and the European XFEL, both in Hamburg (Germany). Since October 2009 a major upgrade is ongoing with the go...
Saved in:
Main Authors: | , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , |
---|---|
Format: | Conference or Workshop Item |
Published: |
2015
|
Online Access: | http://www.scopus.com/inward/record.url?partnerID=HzOxMe3b&scp=84884609912&origin=inward http://cmuir.cmu.ac.th/handle/6653943832/38705 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Chiang Mai University |
id |
th-cmuir.6653943832-38705 |
---|---|
record_format |
dspace |
spelling |
th-cmuir.6653943832-387052015-06-16T07:54:00Z Recent upgrade of the PITZ facility Bähr,J.W. Al-Juboori,H.M. Donat,A. Gensch,U. Grabosch,H.J. Hakobyan,L. Hänel,M. Heller,R.L. Ivanisenko,Y. Jachmann,L. Khojoyan,M.A. Klemz,G. Köhler,W. Koss,G. Krasilnikov,M.B. Kretzschmann,A. Leich,H. Mahgoub,M. Meißner,J.W. Melkumyan,D.O. Otevřel,M. Penno,M. Petrosyan,B. Pohl,M. Rimjaem,S. Rüger,C. Sachwitz,M. Schöneich,B. Schultze,J.F. Shapovalov,A.V. Stephan,F. Tanha,M.R. Trowitzsch,G. Vashchenko,G. Vu,L.V. Walther,T. Brinkmann,A. Fl̈ottmann,K. Gerdau,W. Lederer,S. Lilje,L. Obier,F. Reschke,D. Schreiber,S. Saisut,J. Thongbai,C.S. Knobloch,J. Richter,D.R. Michelato,P. Monaco,L. Pagani,C. Sertore,D. Asova,G. Bonev,I.B. Staykov,L. Tsakov,I. Sandner,W. Will,I.B.S. Naboka,A.N. Paramonov,V.V. Militsyn,B.L. Muratori,B.D. Korostelev,M.S. Vilaithong,T. Ackermann,W. Müller,W.F.O. Schnepp,S.M. Weiland,T. Ullmann,I. Rönsch-Schulenburg,J. Roßbach,J. The Photo Injector Test facility at DESY, Zeuthen site (PITZ), is dedicated to develop and optimize high brightness electron sources for short wavelength Free-Electron Lasers (FELs) like FLASH and the European XFEL, both in Hamburg (Germany). Since October 2009 a major upgrade is ongoing with the goal to improve the accelerating components, the photocathode drive laser system and the beam diagnostics as well. The essential new feature in the running will be an in-vacuum 10 MW RF directional coupler to be used for the RF monitoring and control. In this context a significant improvement of the RF stability is expected. RF pulses of 800 microseconds with 10 Hz repetition rate will be used. The most important upgrade of the diagnostics system will be the implementation of a phase space tomography module (PST) consisting of three FODO cells each surrounded by two screen stations. The goal is an improved measurement of the transverse phase space at different charge levels. The upgraded facility will be described. 2015-06-16T07:53:59Z 2015-06-16T07:53:59Z 2010-12-01 Conference Paper 2-s2.0-84884609912 http://www.scopus.com/inward/record.url?partnerID=HzOxMe3b&scp=84884609912&origin=inward http://cmuir.cmu.ac.th/handle/6653943832/38705 |
institution |
Chiang Mai University |
building |
Chiang Mai University Library |
country |
Thailand |
collection |
CMU Intellectual Repository |
description |
The Photo Injector Test facility at DESY, Zeuthen site (PITZ), is dedicated to develop and optimize high brightness electron sources for short wavelength Free-Electron Lasers (FELs) like FLASH and the European XFEL, both in Hamburg (Germany). Since October 2009 a major upgrade is ongoing with the goal to improve the accelerating components, the photocathode drive laser system and the beam diagnostics as well. The essential new feature in the running will be an in-vacuum 10 MW RF directional coupler to be used for the RF monitoring and control. In this context a significant improvement of the RF stability is expected. RF pulses of 800 microseconds with 10 Hz repetition rate will be used. The most important upgrade of the diagnostics system will be the implementation of a phase space tomography module (PST) consisting of three FODO cells each surrounded by two screen stations. The goal is an improved measurement of the transverse phase space at different charge levels. The upgraded facility will be described. |
format |
Conference or Workshop Item |
author |
Bähr,J.W. Al-Juboori,H.M. Donat,A. Gensch,U. Grabosch,H.J. Hakobyan,L. Hänel,M. Heller,R.L. Ivanisenko,Y. Jachmann,L. Khojoyan,M.A. Klemz,G. Köhler,W. Koss,G. Krasilnikov,M.B. Kretzschmann,A. Leich,H. Mahgoub,M. Meißner,J.W. Melkumyan,D.O. Otevřel,M. Penno,M. Petrosyan,B. Pohl,M. Rimjaem,S. Rüger,C. Sachwitz,M. Schöneich,B. Schultze,J.F. Shapovalov,A.V. Stephan,F. Tanha,M.R. Trowitzsch,G. Vashchenko,G. Vu,L.V. Walther,T. Brinkmann,A. Fl̈ottmann,K. Gerdau,W. Lederer,S. Lilje,L. Obier,F. Reschke,D. Schreiber,S. Saisut,J. Thongbai,C.S. Knobloch,J. Richter,D.R. Michelato,P. Monaco,L. Pagani,C. Sertore,D. Asova,G. Bonev,I.B. Staykov,L. Tsakov,I. Sandner,W. Will,I.B.S. Naboka,A.N. Paramonov,V.V. Militsyn,B.L. Muratori,B.D. Korostelev,M.S. Vilaithong,T. Ackermann,W. Müller,W.F.O. Schnepp,S.M. Weiland,T. Ullmann,I. Rönsch-Schulenburg,J. Roßbach,J. |
spellingShingle |
Bähr,J.W. Al-Juboori,H.M. Donat,A. Gensch,U. Grabosch,H.J. Hakobyan,L. Hänel,M. Heller,R.L. Ivanisenko,Y. Jachmann,L. Khojoyan,M.A. Klemz,G. Köhler,W. Koss,G. Krasilnikov,M.B. Kretzschmann,A. Leich,H. Mahgoub,M. Meißner,J.W. Melkumyan,D.O. Otevřel,M. Penno,M. Petrosyan,B. Pohl,M. Rimjaem,S. Rüger,C. Sachwitz,M. Schöneich,B. Schultze,J.F. Shapovalov,A.V. Stephan,F. Tanha,M.R. Trowitzsch,G. Vashchenko,G. Vu,L.V. Walther,T. Brinkmann,A. Fl̈ottmann,K. Gerdau,W. Lederer,S. Lilje,L. Obier,F. Reschke,D. Schreiber,S. Saisut,J. Thongbai,C.S. Knobloch,J. Richter,D.R. Michelato,P. Monaco,L. Pagani,C. Sertore,D. Asova,G. Bonev,I.B. Staykov,L. Tsakov,I. Sandner,W. Will,I.B.S. Naboka,A.N. Paramonov,V.V. Militsyn,B.L. Muratori,B.D. Korostelev,M.S. Vilaithong,T. Ackermann,W. Müller,W.F.O. Schnepp,S.M. Weiland,T. Ullmann,I. Rönsch-Schulenburg,J. Roßbach,J. Recent upgrade of the PITZ facility |
author_facet |
Bähr,J.W. Al-Juboori,H.M. Donat,A. Gensch,U. Grabosch,H.J. Hakobyan,L. Hänel,M. Heller,R.L. Ivanisenko,Y. Jachmann,L. Khojoyan,M.A. Klemz,G. Köhler,W. Koss,G. Krasilnikov,M.B. Kretzschmann,A. Leich,H. Mahgoub,M. Meißner,J.W. Melkumyan,D.O. Otevřel,M. Penno,M. Petrosyan,B. Pohl,M. Rimjaem,S. Rüger,C. Sachwitz,M. Schöneich,B. Schultze,J.F. Shapovalov,A.V. Stephan,F. Tanha,M.R. Trowitzsch,G. Vashchenko,G. Vu,L.V. Walther,T. Brinkmann,A. Fl̈ottmann,K. Gerdau,W. Lederer,S. Lilje,L. Obier,F. Reschke,D. Schreiber,S. Saisut,J. Thongbai,C.S. Knobloch,J. Richter,D.R. Michelato,P. Monaco,L. Pagani,C. Sertore,D. Asova,G. Bonev,I.B. Staykov,L. Tsakov,I. Sandner,W. Will,I.B.S. Naboka,A.N. Paramonov,V.V. Militsyn,B.L. Muratori,B.D. Korostelev,M.S. Vilaithong,T. Ackermann,W. Müller,W.F.O. Schnepp,S.M. Weiland,T. Ullmann,I. Rönsch-Schulenburg,J. Roßbach,J. |
author_sort |
Bähr,J.W. |
title |
Recent upgrade of the PITZ facility |
title_short |
Recent upgrade of the PITZ facility |
title_full |
Recent upgrade of the PITZ facility |
title_fullStr |
Recent upgrade of the PITZ facility |
title_full_unstemmed |
Recent upgrade of the PITZ facility |
title_sort |
recent upgrade of the pitz facility |
publishDate |
2015 |
url |
http://www.scopus.com/inward/record.url?partnerID=HzOxMe3b&scp=84884609912&origin=inward http://cmuir.cmu.ac.th/handle/6653943832/38705 |
_version_ |
1681421521992548352 |