Analysis of inspection system based on zero acceptance plans with inspection errors

This research evaluate the impact of inspection errors on Zero sampling Plans conducted at incoming, outgoing quality assurance and at Customer site. The incoming lot size is largely greater than the production lot size. With inspection errors of Type II presented, the lot acceptance rate at produce...

Full description

Saved in:
Bibliographic Details
Main Author: Chattinnawat,W.
Format: Article
Published: Chiang Mai University 2015
Subjects:
Online Access:http://www.scopus.com/inward/record.url?partnerID=HzOxMe3b&scp=84872195682&origin=inward
http://cmuir.cmu.ac.th/handle/6653943832/39005
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Chiang Mai University
id th-cmuir.6653943832-39005
record_format dspace
spelling th-cmuir.6653943832-390052015-06-16T08:01:07Z Analysis of inspection system based on zero acceptance plans with inspection errors Chattinnawat,W. Multidisciplinary This research evaluate the impact of inspection errors on Zero sampling Plans conducted at incoming, outgoing quality assurance and at Customer site. The incoming lot size is largely greater than the production lot size. With inspection errors of Type II presented, the lot acceptance rate at producer site is increased as expected whereas that at customer site is decreased. The relationship between the amount of inspection errors and the lot acceptance rate can help producer estimate the current inspection error at both incoming and outgoing quality station which will lead to improvement project plans. 2015-06-16T08:01:07Z 2015-06-16T08:01:07Z 2011-08-01 Article 16851994 2-s2.0-84872195682 http://www.scopus.com/inward/record.url?partnerID=HzOxMe3b&scp=84872195682&origin=inward http://cmuir.cmu.ac.th/handle/6653943832/39005 Chiang Mai University
institution Chiang Mai University
building Chiang Mai University Library
country Thailand
collection CMU Intellectual Repository
topic Multidisciplinary
spellingShingle Multidisciplinary
Chattinnawat,W.
Analysis of inspection system based on zero acceptance plans with inspection errors
description This research evaluate the impact of inspection errors on Zero sampling Plans conducted at incoming, outgoing quality assurance and at Customer site. The incoming lot size is largely greater than the production lot size. With inspection errors of Type II presented, the lot acceptance rate at producer site is increased as expected whereas that at customer site is decreased. The relationship between the amount of inspection errors and the lot acceptance rate can help producer estimate the current inspection error at both incoming and outgoing quality station which will lead to improvement project plans.
format Article
author Chattinnawat,W.
author_facet Chattinnawat,W.
author_sort Chattinnawat,W.
title Analysis of inspection system based on zero acceptance plans with inspection errors
title_short Analysis of inspection system based on zero acceptance plans with inspection errors
title_full Analysis of inspection system based on zero acceptance plans with inspection errors
title_fullStr Analysis of inspection system based on zero acceptance plans with inspection errors
title_full_unstemmed Analysis of inspection system based on zero acceptance plans with inspection errors
title_sort analysis of inspection system based on zero acceptance plans with inspection errors
publisher Chiang Mai University
publishDate 2015
url http://www.scopus.com/inward/record.url?partnerID=HzOxMe3b&scp=84872195682&origin=inward
http://cmuir.cmu.ac.th/handle/6653943832/39005
_version_ 1681421576236433408