A challenge of incentive for small hydropower commercial investment in Thailand

© 2017 Elsevier Ltd Thailand implemented a premium-price Feed-in Tariff (FIT), or ‘Adder’ program, in 2006 as an incentive to generate renewable energy. However, the Adder rate for hydropower was very lo w, and failed to motivate investors. Later, the Thai government decided to change the Adder prog...

Full description

Saved in:
Bibliographic Details
Main Authors: Supriyasilp T., Pinitjitsamut M., Pongput K., Wanaset A., Boonyanupong S., Rakthai S., Boonyasirikul T.
Format: Journal
Published: 2017
Online Access:https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=85019029847&origin=inward
http://cmuir.cmu.ac.th/jspui/handle/6653943832/40103
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Chiang Mai University
id th-cmuir.6653943832-40103
record_format dspace
spelling th-cmuir.6653943832-401032017-09-28T04:05:18Z A challenge of incentive for small hydropower commercial investment in Thailand Supriyasilp T. Pinitjitsamut M. Pongput K. Wanaset A. Boonyanupong S. Rakthai S. Boonyasirikul T. © 2017 Elsevier Ltd Thailand implemented a premium-price Feed-in Tariff (FIT), or ‘Adder’ program, in 2006 as an incentive to generate renewable energy. However, the Adder rate for hydropower was very lo w, and failed to motivate investors. Later, the Thai government decided to change the Adder program to a fixed-price FIT instead. As of 2014, no studies had analysed hydroelectric power rates in Thailand. Therefore, the objective of this study is to determine the suitable rate for a fixed-price FIT for hydropower in Thailand, using the concept of the actual levelized cost of renewable energy generation. The results showed that the structure of the FIT rate was comprised of three elements: installed capacity, hydropower scheme, and grid connection. From experience with the Adder program, the rate will not be limited at only 200 kW. The proposed rate offers a steady annual return for over 25 years. The recommended rate provides an IRR of 12%, with water fee included. Moreover, we recommend an exclusive promotion rate to promote partnerships with, and to motivate, local communities to conserve and manage the water resource. Furthermore, we suggest using a guideline for calculating social cost-benefits as avoided costs, as well as allocating social benefits. 2017-09-28T04:05:18Z 2017-09-28T04:05:18Z Journal 09601481 2-s2.0-85019029847 10.1016/j.renene.2017.05.009 https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=85019029847&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/40103
institution Chiang Mai University
building Chiang Mai University Library
country Thailand
collection CMU Intellectual Repository
description © 2017 Elsevier Ltd Thailand implemented a premium-price Feed-in Tariff (FIT), or ‘Adder’ program, in 2006 as an incentive to generate renewable energy. However, the Adder rate for hydropower was very lo w, and failed to motivate investors. Later, the Thai government decided to change the Adder program to a fixed-price FIT instead. As of 2014, no studies had analysed hydroelectric power rates in Thailand. Therefore, the objective of this study is to determine the suitable rate for a fixed-price FIT for hydropower in Thailand, using the concept of the actual levelized cost of renewable energy generation. The results showed that the structure of the FIT rate was comprised of three elements: installed capacity, hydropower scheme, and grid connection. From experience with the Adder program, the rate will not be limited at only 200 kW. The proposed rate offers a steady annual return for over 25 years. The recommended rate provides an IRR of 12%, with water fee included. Moreover, we recommend an exclusive promotion rate to promote partnerships with, and to motivate, local communities to conserve and manage the water resource. Furthermore, we suggest using a guideline for calculating social cost-benefits as avoided costs, as well as allocating social benefits.
format Journal
author Supriyasilp T.
Pinitjitsamut M.
Pongput K.
Wanaset A.
Boonyanupong S.
Rakthai S.
Boonyasirikul T.
spellingShingle Supriyasilp T.
Pinitjitsamut M.
Pongput K.
Wanaset A.
Boonyanupong S.
Rakthai S.
Boonyasirikul T.
A challenge of incentive for small hydropower commercial investment in Thailand
author_facet Supriyasilp T.
Pinitjitsamut M.
Pongput K.
Wanaset A.
Boonyanupong S.
Rakthai S.
Boonyasirikul T.
author_sort Supriyasilp T.
title A challenge of incentive for small hydropower commercial investment in Thailand
title_short A challenge of incentive for small hydropower commercial investment in Thailand
title_full A challenge of incentive for small hydropower commercial investment in Thailand
title_fullStr A challenge of incentive for small hydropower commercial investment in Thailand
title_full_unstemmed A challenge of incentive for small hydropower commercial investment in Thailand
title_sort challenge of incentive for small hydropower commercial investment in thailand
publishDate 2017
url https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=85019029847&origin=inward
http://cmuir.cmu.ac.th/jspui/handle/6653943832/40103
_version_ 1681421748117962752