Cost evaluation of current uprating of overhead transmission lines using ACSR and HTLS conductors
© 2017 IEEE. This work presents cost evaluation of current uprating of overhead transmission lines by using Aluminum Conductor Steel Reinforced (ACSR) and High Temperature Low Sag (HTLS) conductors. The evaluation method is carried out based on twofold and fourfold ampacities, under both normal and...
محفوظ في:
المؤلفون الرئيسيون: | , |
---|---|
التنسيق: | وقائع المؤتمر |
منشور في: |
2017
|
الوصول للمادة أونلاين: | https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=85026746617&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/40278 |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
id |
th-cmuir.6653943832-40278 |
---|---|
record_format |
dspace |
spelling |
th-cmuir.6653943832-402782017-09-28T04:08:41Z Cost evaluation of current uprating of overhead transmission lines using ACSR and HTLS conductors Nuchprayoon S. Chaichana A. © 2017 IEEE. This work presents cost evaluation of current uprating of overhead transmission lines by using Aluminum Conductor Steel Reinforced (ACSR) and High Temperature Low Sag (HTLS) conductors. The evaluation method is carried out based on twofold and fourfold ampacities, under both normal and stressed operating conditions. The test case is a 230-kV, double-circuit, transmission lines using 1272 MCM ACSR conductors. The candidate conductors are five types of HTLS conductors with comparable size. The cost components under consideration are demolition cost, construction and installation costs, conductor cost, cost of energy losses, and land cost. Upon evaluation of the total costs, the selection criteria of proper conductor are proposed. 2017-09-28T04:08:41Z 2017-09-28T04:08:41Z Conference Proceeding 2-s2.0-85026746617 10.1109/EEEIC.2017.7977606 https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=85026746617&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/40278 |
institution |
Chiang Mai University |
building |
Chiang Mai University Library |
country |
Thailand |
collection |
CMU Intellectual Repository |
description |
© 2017 IEEE. This work presents cost evaluation of current uprating of overhead transmission lines by using Aluminum Conductor Steel Reinforced (ACSR) and High Temperature Low Sag (HTLS) conductors. The evaluation method is carried out based on twofold and fourfold ampacities, under both normal and stressed operating conditions. The test case is a 230-kV, double-circuit, transmission lines using 1272 MCM ACSR conductors. The candidate conductors are five types of HTLS conductors with comparable size. The cost components under consideration are demolition cost, construction and installation costs, conductor cost, cost of energy losses, and land cost. Upon evaluation of the total costs, the selection criteria of proper conductor are proposed. |
format |
Conference Proceeding |
author |
Nuchprayoon S. Chaichana A. |
spellingShingle |
Nuchprayoon S. Chaichana A. Cost evaluation of current uprating of overhead transmission lines using ACSR and HTLS conductors |
author_facet |
Nuchprayoon S. Chaichana A. |
author_sort |
Nuchprayoon S. |
title |
Cost evaluation of current uprating of overhead transmission lines using ACSR and HTLS conductors |
title_short |
Cost evaluation of current uprating of overhead transmission lines using ACSR and HTLS conductors |
title_full |
Cost evaluation of current uprating of overhead transmission lines using ACSR and HTLS conductors |
title_fullStr |
Cost evaluation of current uprating of overhead transmission lines using ACSR and HTLS conductors |
title_full_unstemmed |
Cost evaluation of current uprating of overhead transmission lines using ACSR and HTLS conductors |
title_sort |
cost evaluation of current uprating of overhead transmission lines using acsr and htls conductors |
publishDate |
2017 |
url |
https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=85026746617&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/40278 |
_version_ |
1681421780334411776 |