Implementation of the overall equipment cost loss (OECL) methodology for comparison with overall equipment effectiveness (OEE)

© Emerald Group Publishing Limited. Purpose - The purpose of this paper is to describe the overall equipment cost loss (OECL) methodology and an implementation of this methodology, to compare the outcomes of OECL with those of overall equipment effectiveness (OEE), and finally to identify the benefi...

Full description

Saved in:
Bibliographic Details
Main Author: Wudhikarn R.
Format: Journal
Published: 2017
Online Access:https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=84959317152&origin=inward
http://cmuir.cmu.ac.th/jspui/handle/6653943832/42024
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Chiang Mai University
id th-cmuir.6653943832-42024
record_format dspace
spelling th-cmuir.6653943832-420242017-09-28T04:24:46Z Implementation of the overall equipment cost loss (OECL) methodology for comparison with overall equipment effectiveness (OEE) Wudhikarn R. © Emerald Group Publishing Limited. Purpose - The purpose of this paper is to describe the overall equipment cost loss (OECL) methodology and an implementation of this methodology, to compare the outcomes of OECL with those of overall equipment effectiveness (OEE), and finally to identify the benefits offered by this new methodology. Design/methodology/approach - The proposed methodology, OECL, combines six large loss models and a financial model in the performance evaluation of equipment. The six large losses are converted into monetary units. OECL is a new way of evaluating equipment performance that differs from the original OEE methodology and overcomes some of the limitations of OEE. This new methodology can be used to rank problematic machines by accounting for production elements together with finance elements. Findings - The OECL and OEE methodologies rank problematic machines differently. Research limitations/implications - Efforts were made in this research to identify factors affecting OECL outcomes, but it was found that it was not possible to apply OECL to all scenarios. Practical implications - The OECL model can be implemented in a real manufacturing company to help decision-makers better determine the magnitudes of equipment problems and rank problematic pieces of equipment appropriately. Originality/value - This OECL method is able to overcome some of OEE's weaknesses. It can properly prioritise problematic machines by considering both cost and losses. 2017-09-28T04:24:46Z 2017-09-28T04:24:46Z 2016-03-14 Journal 13552511 2-s2.0-84959317152 10.1108/JQME-12-2011-0001 https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=84959317152&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/42024
institution Chiang Mai University
building Chiang Mai University Library
country Thailand
collection CMU Intellectual Repository
description © Emerald Group Publishing Limited. Purpose - The purpose of this paper is to describe the overall equipment cost loss (OECL) methodology and an implementation of this methodology, to compare the outcomes of OECL with those of overall equipment effectiveness (OEE), and finally to identify the benefits offered by this new methodology. Design/methodology/approach - The proposed methodology, OECL, combines six large loss models and a financial model in the performance evaluation of equipment. The six large losses are converted into monetary units. OECL is a new way of evaluating equipment performance that differs from the original OEE methodology and overcomes some of the limitations of OEE. This new methodology can be used to rank problematic machines by accounting for production elements together with finance elements. Findings - The OECL and OEE methodologies rank problematic machines differently. Research limitations/implications - Efforts were made in this research to identify factors affecting OECL outcomes, but it was found that it was not possible to apply OECL to all scenarios. Practical implications - The OECL model can be implemented in a real manufacturing company to help decision-makers better determine the magnitudes of equipment problems and rank problematic pieces of equipment appropriately. Originality/value - This OECL method is able to overcome some of OEE's weaknesses. It can properly prioritise problematic machines by considering both cost and losses.
format Journal
author Wudhikarn R.
spellingShingle Wudhikarn R.
Implementation of the overall equipment cost loss (OECL) methodology for comparison with overall equipment effectiveness (OEE)
author_facet Wudhikarn R.
author_sort Wudhikarn R.
title Implementation of the overall equipment cost loss (OECL) methodology for comparison with overall equipment effectiveness (OEE)
title_short Implementation of the overall equipment cost loss (OECL) methodology for comparison with overall equipment effectiveness (OEE)
title_full Implementation of the overall equipment cost loss (OECL) methodology for comparison with overall equipment effectiveness (OEE)
title_fullStr Implementation of the overall equipment cost loss (OECL) methodology for comparison with overall equipment effectiveness (OEE)
title_full_unstemmed Implementation of the overall equipment cost loss (OECL) methodology for comparison with overall equipment effectiveness (OEE)
title_sort implementation of the overall equipment cost loss (oecl) methodology for comparison with overall equipment effectiveness (oee)
publishDate 2017
url https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=84959317152&origin=inward
http://cmuir.cmu.ac.th/jspui/handle/6653943832/42024
_version_ 1681422111175868416