Unlock DDI's capacity by re-routing left-turns at nearby intersections
© ASCE. Since the opening of the first Diverging Diamond Interchange (DDI) in the U.S. in June 2009, 34 DDIs have been completed as of March 2014. At least 40 more DDIs are being planned/designed/constructed. The sheer number of DDI projects indicates this innovative design is gaining wide acceptanc...
Saved in:
Main Authors: | , |
---|---|
Format: | Conference Proceeding |
Published: |
2018
|
Online Access: | https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=84924987540&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/45534 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Chiang Mai University |
id |
th-cmuir.6653943832-45534 |
---|---|
record_format |
dspace |
spelling |
th-cmuir.6653943832-455342018-01-24T06:11:52Z Unlock DDI's capacity by re-routing left-turns at nearby intersections Wei Zhang Nopadon Kronprasert © ASCE. Since the opening of the first Diverging Diamond Interchange (DDI) in the U.S. in June 2009, 34 DDIs have been completed as of March 2014. At least 40 more DDIs are being planned/designed/constructed. The sheer number of DDI projects indicates this innovative design is gaining wide acceptance. Field results demonstrate that this design is much more cost effective than the conventional improvement designs. By converting the 3-phase signal at traditional diamonds into 2-phase, DDI provides more effective green time for moving traffic. Most DDIs constructed to date are near large business, retail, and/or medical centers; and the intersections adjacent to DDI crossovers often have high traffic demands and require 6 or more phases and longer cycle length to serve the demands from conflicting movements. Such condition limits the DDI's capacity utilization. This study explored three approaches to reduce the cycle length at nearby signals - relaxed Bowtie, Superstreet, and Quadrant Roadway intersections. They can all convert the adjacent intersections into 2-phase operation and enable the DDI to operate more efficiently. The ideas were tested in a simulated environment at a proposed DDI in Anchorage, Alaska. The simulation results indicate level-of-service at nearby intersections may be improved from D/E to A/B. 2018-01-24T06:11:52Z 2018-01-24T06:11:52Z 2014-01-01 Conference Proceeding 2-s2.0-84924987540 10.1061/9780784413869.020 https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=84924987540&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/45534 |
institution |
Chiang Mai University |
building |
Chiang Mai University Library |
country |
Thailand |
collection |
CMU Intellectual Repository |
description |
© ASCE. Since the opening of the first Diverging Diamond Interchange (DDI) in the U.S. in June 2009, 34 DDIs have been completed as of March 2014. At least 40 more DDIs are being planned/designed/constructed. The sheer number of DDI projects indicates this innovative design is gaining wide acceptance. Field results demonstrate that this design is much more cost effective than the conventional improvement designs. By converting the 3-phase signal at traditional diamonds into 2-phase, DDI provides more effective green time for moving traffic. Most DDIs constructed to date are near large business, retail, and/or medical centers; and the intersections adjacent to DDI crossovers often have high traffic demands and require 6 or more phases and longer cycle length to serve the demands from conflicting movements. Such condition limits the DDI's capacity utilization. This study explored three approaches to reduce the cycle length at nearby signals - relaxed Bowtie, Superstreet, and Quadrant Roadway intersections. They can all convert the adjacent intersections into 2-phase operation and enable the DDI to operate more efficiently. The ideas were tested in a simulated environment at a proposed DDI in Anchorage, Alaska. The simulation results indicate level-of-service at nearby intersections may be improved from D/E to A/B. |
format |
Conference Proceeding |
author |
Wei Zhang Nopadon Kronprasert |
spellingShingle |
Wei Zhang Nopadon Kronprasert Unlock DDI's capacity by re-routing left-turns at nearby intersections |
author_facet |
Wei Zhang Nopadon Kronprasert |
author_sort |
Wei Zhang |
title |
Unlock DDI's capacity by re-routing left-turns at nearby intersections |
title_short |
Unlock DDI's capacity by re-routing left-turns at nearby intersections |
title_full |
Unlock DDI's capacity by re-routing left-turns at nearby intersections |
title_fullStr |
Unlock DDI's capacity by re-routing left-turns at nearby intersections |
title_full_unstemmed |
Unlock DDI's capacity by re-routing left-turns at nearby intersections |
title_sort |
unlock ddi's capacity by re-routing left-turns at nearby intersections |
publishDate |
2018 |
url |
https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=84924987540&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/45534 |
_version_ |
1681422763246485504 |