Decision analysis on generation capacity of a wind park
The investment decision on generation capacity of a wind park is difficult when wind studies or data are neither available nor sufficient to provide adequate information for developing a wind power project. Although new measurement is possible but it is definitely time consuming. To determine the op...
Saved in:
Main Authors: | , , , |
---|---|
Format: | Journal |
Published: |
2018
|
Subjects: | |
Online Access: | https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=67650742585&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/49048 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Chiang Mai University |
id |
th-cmuir.6653943832-49048 |
---|---|
record_format |
dspace |
spelling |
th-cmuir.6653943832-490482018-08-16T02:08:58Z Decision analysis on generation capacity of a wind park C. Kongnam S. Nuchprayoon S. Premrudeepreechacharn S. Uatrongjit Energy The investment decision on generation capacity of a wind park is difficult when wind studies or data are neither available nor sufficient to provide adequate information for developing a wind power project. Although new measurement is possible but it is definitely time consuming. To determine the optimum capacity, decision analysis techniques are proposed in this paper to cope with uncertainties arising from wind speed distribution and power-speed characteristics. The wind speed distribution is modeled from the measured data, the Rayleigh distribution, and the Weibull distribution. The power-speed curve of a wind turbine from cut-in speed to rated speed is modeled by using linear, parabolic, cubic, and quadratic characteristics. The optimization model is formulated as a mixed-integer nonlinear programming problem. The constraints are considered as interval bounds so that a set of feasible solutions is obtained. The optimum solution can be determined by using the profit-to-cost and profit-to-area ratios as performance metrics of investment. Decision analysis rules are then applied to overcome the uncertainty problem and to refine the investment plan. The proposed procedure has been tested with the wind power project of the Electricity Generating Authority of Thailand. © 2009 Elsevier Ltd. All rights reserved. 2018-08-16T02:08:58Z 2018-08-16T02:08:58Z 2009-10-01 Journal 13640321 2-s2.0-67650742585 10.1016/j.rser.2009.01.023 https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=67650742585&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/49048 |
institution |
Chiang Mai University |
building |
Chiang Mai University Library |
country |
Thailand |
collection |
CMU Intellectual Repository |
topic |
Energy |
spellingShingle |
Energy C. Kongnam S. Nuchprayoon S. Premrudeepreechacharn S. Uatrongjit Decision analysis on generation capacity of a wind park |
description |
The investment decision on generation capacity of a wind park is difficult when wind studies or data are neither available nor sufficient to provide adequate information for developing a wind power project. Although new measurement is possible but it is definitely time consuming. To determine the optimum capacity, decision analysis techniques are proposed in this paper to cope with uncertainties arising from wind speed distribution and power-speed characteristics. The wind speed distribution is modeled from the measured data, the Rayleigh distribution, and the Weibull distribution. The power-speed curve of a wind turbine from cut-in speed to rated speed is modeled by using linear, parabolic, cubic, and quadratic characteristics. The optimization model is formulated as a mixed-integer nonlinear programming problem. The constraints are considered as interval bounds so that a set of feasible solutions is obtained. The optimum solution can be determined by using the profit-to-cost and profit-to-area ratios as performance metrics of investment. Decision analysis rules are then applied to overcome the uncertainty problem and to refine the investment plan. The proposed procedure has been tested with the wind power project of the Electricity Generating Authority of Thailand. © 2009 Elsevier Ltd. All rights reserved. |
format |
Journal |
author |
C. Kongnam S. Nuchprayoon S. Premrudeepreechacharn S. Uatrongjit |
author_facet |
C. Kongnam S. Nuchprayoon S. Premrudeepreechacharn S. Uatrongjit |
author_sort |
C. Kongnam |
title |
Decision analysis on generation capacity of a wind park |
title_short |
Decision analysis on generation capacity of a wind park |
title_full |
Decision analysis on generation capacity of a wind park |
title_fullStr |
Decision analysis on generation capacity of a wind park |
title_full_unstemmed |
Decision analysis on generation capacity of a wind park |
title_sort |
decision analysis on generation capacity of a wind park |
publishDate |
2018 |
url |
https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=67650742585&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/49048 |
_version_ |
1681423339962236928 |