Decision analysis on generation capacity of a wind park

The investment decision on generation capacity of a wind park is difficult when wind studies or data are neither available nor sufficient to provide adequate information for developing a wind power project. Although new measurement is possible but it is definitely time consuming. To determine the op...

Full description

Saved in:
Bibliographic Details
Main Authors: C. Kongnam, S. Nuchprayoon, S. Premrudeepreechacharn, S. Uatrongjit
Format: Journal
Published: 2018
Subjects:
Online Access:https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=67650742585&origin=inward
http://cmuir.cmu.ac.th/jspui/handle/6653943832/49048
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Chiang Mai University
id th-cmuir.6653943832-49048
record_format dspace
spelling th-cmuir.6653943832-490482018-08-16T02:08:58Z Decision analysis on generation capacity of a wind park C. Kongnam S. Nuchprayoon S. Premrudeepreechacharn S. Uatrongjit Energy The investment decision on generation capacity of a wind park is difficult when wind studies or data are neither available nor sufficient to provide adequate information for developing a wind power project. Although new measurement is possible but it is definitely time consuming. To determine the optimum capacity, decision analysis techniques are proposed in this paper to cope with uncertainties arising from wind speed distribution and power-speed characteristics. The wind speed distribution is modeled from the measured data, the Rayleigh distribution, and the Weibull distribution. The power-speed curve of a wind turbine from cut-in speed to rated speed is modeled by using linear, parabolic, cubic, and quadratic characteristics. The optimization model is formulated as a mixed-integer nonlinear programming problem. The constraints are considered as interval bounds so that a set of feasible solutions is obtained. The optimum solution can be determined by using the profit-to-cost and profit-to-area ratios as performance metrics of investment. Decision analysis rules are then applied to overcome the uncertainty problem and to refine the investment plan. The proposed procedure has been tested with the wind power project of the Electricity Generating Authority of Thailand. © 2009 Elsevier Ltd. All rights reserved. 2018-08-16T02:08:58Z 2018-08-16T02:08:58Z 2009-10-01 Journal 13640321 2-s2.0-67650742585 10.1016/j.rser.2009.01.023 https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=67650742585&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/49048
institution Chiang Mai University
building Chiang Mai University Library
country Thailand
collection CMU Intellectual Repository
topic Energy
spellingShingle Energy
C. Kongnam
S. Nuchprayoon
S. Premrudeepreechacharn
S. Uatrongjit
Decision analysis on generation capacity of a wind park
description The investment decision on generation capacity of a wind park is difficult when wind studies or data are neither available nor sufficient to provide adequate information for developing a wind power project. Although new measurement is possible but it is definitely time consuming. To determine the optimum capacity, decision analysis techniques are proposed in this paper to cope with uncertainties arising from wind speed distribution and power-speed characteristics. The wind speed distribution is modeled from the measured data, the Rayleigh distribution, and the Weibull distribution. The power-speed curve of a wind turbine from cut-in speed to rated speed is modeled by using linear, parabolic, cubic, and quadratic characteristics. The optimization model is formulated as a mixed-integer nonlinear programming problem. The constraints are considered as interval bounds so that a set of feasible solutions is obtained. The optimum solution can be determined by using the profit-to-cost and profit-to-area ratios as performance metrics of investment. Decision analysis rules are then applied to overcome the uncertainty problem and to refine the investment plan. The proposed procedure has been tested with the wind power project of the Electricity Generating Authority of Thailand. © 2009 Elsevier Ltd. All rights reserved.
format Journal
author C. Kongnam
S. Nuchprayoon
S. Premrudeepreechacharn
S. Uatrongjit
author_facet C. Kongnam
S. Nuchprayoon
S. Premrudeepreechacharn
S. Uatrongjit
author_sort C. Kongnam
title Decision analysis on generation capacity of a wind park
title_short Decision analysis on generation capacity of a wind park
title_full Decision analysis on generation capacity of a wind park
title_fullStr Decision analysis on generation capacity of a wind park
title_full_unstemmed Decision analysis on generation capacity of a wind park
title_sort decision analysis on generation capacity of a wind park
publishDate 2018
url https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=67650742585&origin=inward
http://cmuir.cmu.ac.th/jspui/handle/6653943832/49048
_version_ 1681423339962236928