Evaluation of switching overvoltage in 500 kV transmission line interconnection Nam Theun 2 power plant to Roi Et 2 substation

This paper investigates the overvoltage due to different types of switching in Nam Theun 2 - Roi Et 2 500 kV network. The study is based on PSCAD/EMTDC performed for a guide line for 500 kV operations in Lao PDR. The appropriate representation for the various components such as transformer, transmis...

Full description

Saved in:
Bibliographic Details
Main Authors: T. Keokhoungning, S. Premrudeepreechacharn, K. Ngamsanroaj
Format: Conference Proceeding
Published: 2018
Subjects:
Online Access:https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=69049104149&origin=inward
http://cmuir.cmu.ac.th/jspui/handle/6653943832/49052
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Chiang Mai University

Similar Items