Implementation of overall equipment effectiveness in wire mesh manufacturing
This study presents the implementation of overall equipment effectiveness (OEE) at a small enterprise manufacturing wire mesh in the developing country of Thailand. This company had never established any performance measurement before. Therefore, an appropriate indicator was elaborately selected for...
Saved in:
Main Author: | |
---|---|
Format: | Conference Proceeding |
Published: |
2018
|
Subjects: | |
Online Access: | https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=84856557100&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/49772 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Chiang Mai University |
id |
th-cmuir.6653943832-49772 |
---|---|
record_format |
dspace |
spelling |
th-cmuir.6653943832-497722018-09-04T04:20:28Z Implementation of overall equipment effectiveness in wire mesh manufacturing Ratapol Wudhikarn Business, Management and Accounting Engineering This study presents the implementation of overall equipment effectiveness (OEE) at a small enterprise manufacturing wire mesh in the developing country of Thailand. This company had never established any performance measurement before. Therefore, an appropriate indicator was elaborately selected for the case study, and OEE was chosen. OEE is employed as a simple indicator, but it is still an effective method for analyzing the efficiency of a single machine and an integrated machinery system. The case study of OEE was carried out from set-up stage to full implementation. Several processes were carried out to establish the OEE indicator. OEE helped the company identify the primary problems concerning the availability rate and performance efficiency. The management made the decisions by relying on OEE results and its details, and mandated the elimination of the root causes of breakdown losses and speed losses. Finally, after six months of full implementation, OEE performances improved by over 60 percentages, since availability rate and performance efficiency were improved over 75 percentages, and quality rate was maintained at the same level. © 2011 IEEE. 2018-09-04T04:17:54Z 2018-09-04T04:17:54Z 2011-12-01 Conference Proceeding 2157362X 21573611 2-s2.0-84856557100 10.1109/IEEM.2011.6118030 https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=84856557100&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/49772 |
institution |
Chiang Mai University |
building |
Chiang Mai University Library |
country |
Thailand |
collection |
CMU Intellectual Repository |
topic |
Business, Management and Accounting Engineering |
spellingShingle |
Business, Management and Accounting Engineering Ratapol Wudhikarn Implementation of overall equipment effectiveness in wire mesh manufacturing |
description |
This study presents the implementation of overall equipment effectiveness (OEE) at a small enterprise manufacturing wire mesh in the developing country of Thailand. This company had never established any performance measurement before. Therefore, an appropriate indicator was elaborately selected for the case study, and OEE was chosen. OEE is employed as a simple indicator, but it is still an effective method for analyzing the efficiency of a single machine and an integrated machinery system. The case study of OEE was carried out from set-up stage to full implementation. Several processes were carried out to establish the OEE indicator. OEE helped the company identify the primary problems concerning the availability rate and performance efficiency. The management made the decisions by relying on OEE results and its details, and mandated the elimination of the root causes of breakdown losses and speed losses. Finally, after six months of full implementation, OEE performances improved by over 60 percentages, since availability rate and performance efficiency were improved over 75 percentages, and quality rate was maintained at the same level. © 2011 IEEE. |
format |
Conference Proceeding |
author |
Ratapol Wudhikarn |
author_facet |
Ratapol Wudhikarn |
author_sort |
Ratapol Wudhikarn |
title |
Implementation of overall equipment effectiveness in wire mesh manufacturing |
title_short |
Implementation of overall equipment effectiveness in wire mesh manufacturing |
title_full |
Implementation of overall equipment effectiveness in wire mesh manufacturing |
title_fullStr |
Implementation of overall equipment effectiveness in wire mesh manufacturing |
title_full_unstemmed |
Implementation of overall equipment effectiveness in wire mesh manufacturing |
title_sort |
implementation of overall equipment effectiveness in wire mesh manufacturing |
publishDate |
2018 |
url |
https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=84856557100&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/49772 |
_version_ |
1681423470203764736 |