Preventive maintenance optimization for excitation system of bhumibol hydro power plant

Power plant reliability is highly related to the way maintenance tasks on system equipments are performed. From operation record of bhumibol hydro power plant between 2002- 2006, the unplanned outage hours (uoh) of power plant are varied. The main factor of uoh is mostly caused by excitation system...

Full description

Saved in:
Bibliographic Details
Main Authors: S. Pansrisu, S. Premrudeepreechacharn
Format: Conference Proceeding
Published: 2018
Subjects:
Online Access:https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=78649602805&origin=inward
http://cmuir.cmu.ac.th/jspui/handle/6653943832/50755
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Chiang Mai University
id th-cmuir.6653943832-50755
record_format dspace
spelling th-cmuir.6653943832-507552018-09-04T04:45:13Z Preventive maintenance optimization for excitation system of bhumibol hydro power plant S. Pansrisu S. Premrudeepreechacharn Energy Power plant reliability is highly related to the way maintenance tasks on system equipments are performed. From operation record of bhumibol hydro power plant between 2002- 2006, the unplanned outage hours (uoh) of power plant are varied. The main factor of uoh is mostly caused by excitation system of power plant. Therefore, the maintenance system of excitation system has to be revised in order to improve of reliability of power plant. This paper proposes a maintenance tools called preventive maintenance optimization(pmo). This approach has improved maintenance related to failure mode of equipment. Since wiebull distribution is able to find mean time to failure (mttf), failure rate and reliability with small number of failure data due to limited of information. Therefore, weibull distribution is used as statistical analysis. This paper has applied the pmo with bhumibol power plant unit 1-4. From the simulation results has shown that the maintenance plan from pmo can improve power plant reliability compared with previous shutdown planned for maintenance. In addition, the power plant also can reduce unnecessary planned maintenance. The reliability of system is also increased. This study results are assessed, analyzed and considered as a guide line for maintenance excitation system of other egat's hydro power plant. 2018-09-04T04:45:13Z 2018-09-04T04:45:13Z 2010-12-06 Conference Proceeding 2-s2.0-78649602805 https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=78649602805&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/50755
institution Chiang Mai University
building Chiang Mai University Library
country Thailand
collection CMU Intellectual Repository
topic Energy
spellingShingle Energy
S. Pansrisu
S. Premrudeepreechacharn
Preventive maintenance optimization for excitation system of bhumibol hydro power plant
description Power plant reliability is highly related to the way maintenance tasks on system equipments are performed. From operation record of bhumibol hydro power plant between 2002- 2006, the unplanned outage hours (uoh) of power plant are varied. The main factor of uoh is mostly caused by excitation system of power plant. Therefore, the maintenance system of excitation system has to be revised in order to improve of reliability of power plant. This paper proposes a maintenance tools called preventive maintenance optimization(pmo). This approach has improved maintenance related to failure mode of equipment. Since wiebull distribution is able to find mean time to failure (mttf), failure rate and reliability with small number of failure data due to limited of information. Therefore, weibull distribution is used as statistical analysis. This paper has applied the pmo with bhumibol power plant unit 1-4. From the simulation results has shown that the maintenance plan from pmo can improve power plant reliability compared with previous shutdown planned for maintenance. In addition, the power plant also can reduce unnecessary planned maintenance. The reliability of system is also increased. This study results are assessed, analyzed and considered as a guide line for maintenance excitation system of other egat's hydro power plant.
format Conference Proceeding
author S. Pansrisu
S. Premrudeepreechacharn
author_facet S. Pansrisu
S. Premrudeepreechacharn
author_sort S. Pansrisu
title Preventive maintenance optimization for excitation system of bhumibol hydro power plant
title_short Preventive maintenance optimization for excitation system of bhumibol hydro power plant
title_full Preventive maintenance optimization for excitation system of bhumibol hydro power plant
title_fullStr Preventive maintenance optimization for excitation system of bhumibol hydro power plant
title_full_unstemmed Preventive maintenance optimization for excitation system of bhumibol hydro power plant
title_sort preventive maintenance optimization for excitation system of bhumibol hydro power plant
publishDate 2018
url https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=78649602805&origin=inward
http://cmuir.cmu.ac.th/jspui/handle/6653943832/50755
_version_ 1681423646999969792