Preventive maintenance optimization for excitation system of bhumibol hydro power plant
Power plant reliability is highly related to the way maintenance tasks on system equipments are performed. From operation record of bhumibol hydro power plant between 2002- 2006, the unplanned outage hours (uoh) of power plant are varied. The main factor of uoh is mostly caused by excitation system...
Saved in:
Main Authors: | , |
---|---|
Format: | Conference Proceeding |
Published: |
2018
|
Subjects: | |
Online Access: | https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=78649602805&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/50755 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Chiang Mai University |
id |
th-cmuir.6653943832-50755 |
---|---|
record_format |
dspace |
spelling |
th-cmuir.6653943832-507552018-09-04T04:45:13Z Preventive maintenance optimization for excitation system of bhumibol hydro power plant S. Pansrisu S. Premrudeepreechacharn Energy Power plant reliability is highly related to the way maintenance tasks on system equipments are performed. From operation record of bhumibol hydro power plant between 2002- 2006, the unplanned outage hours (uoh) of power plant are varied. The main factor of uoh is mostly caused by excitation system of power plant. Therefore, the maintenance system of excitation system has to be revised in order to improve of reliability of power plant. This paper proposes a maintenance tools called preventive maintenance optimization(pmo). This approach has improved maintenance related to failure mode of equipment. Since wiebull distribution is able to find mean time to failure (mttf), failure rate and reliability with small number of failure data due to limited of information. Therefore, weibull distribution is used as statistical analysis. This paper has applied the pmo with bhumibol power plant unit 1-4. From the simulation results has shown that the maintenance plan from pmo can improve power plant reliability compared with previous shutdown planned for maintenance. In addition, the power plant also can reduce unnecessary planned maintenance. The reliability of system is also increased. This study results are assessed, analyzed and considered as a guide line for maintenance excitation system of other egat's hydro power plant. 2018-09-04T04:45:13Z 2018-09-04T04:45:13Z 2010-12-06 Conference Proceeding 2-s2.0-78649602805 https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=78649602805&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/50755 |
institution |
Chiang Mai University |
building |
Chiang Mai University Library |
country |
Thailand |
collection |
CMU Intellectual Repository |
topic |
Energy |
spellingShingle |
Energy S. Pansrisu S. Premrudeepreechacharn Preventive maintenance optimization for excitation system of bhumibol hydro power plant |
description |
Power plant reliability is highly related to the way maintenance tasks on system equipments are performed. From operation record of bhumibol hydro power plant between 2002- 2006, the unplanned outage hours (uoh) of power plant are varied. The main factor of uoh is mostly caused by excitation system of power plant. Therefore, the maintenance system of excitation system has to be revised in order to improve of reliability of power plant. This paper proposes a maintenance tools called preventive maintenance optimization(pmo). This approach has improved maintenance related to failure mode of equipment. Since wiebull distribution is able to find mean time to failure (mttf), failure rate and reliability with small number of failure data due to limited of information. Therefore, weibull distribution is used as statistical analysis. This paper has applied the pmo with bhumibol power plant unit 1-4. From the simulation results has shown that the maintenance plan from pmo can improve power plant reliability compared with previous shutdown planned for maintenance. In addition, the power plant also can reduce unnecessary planned maintenance. The reliability of system is also increased. This study results are assessed, analyzed and considered as a guide line for maintenance excitation system of other egat's hydro power plant. |
format |
Conference Proceeding |
author |
S. Pansrisu S. Premrudeepreechacharn |
author_facet |
S. Pansrisu S. Premrudeepreechacharn |
author_sort |
S. Pansrisu |
title |
Preventive maintenance optimization for excitation system of bhumibol hydro power plant |
title_short |
Preventive maintenance optimization for excitation system of bhumibol hydro power plant |
title_full |
Preventive maintenance optimization for excitation system of bhumibol hydro power plant |
title_fullStr |
Preventive maintenance optimization for excitation system of bhumibol hydro power plant |
title_full_unstemmed |
Preventive maintenance optimization for excitation system of bhumibol hydro power plant |
title_sort |
preventive maintenance optimization for excitation system of bhumibol hydro power plant |
publishDate |
2018 |
url |
https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=78649602805&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/50755 |
_version_ |
1681423646999969792 |