Unlock DDI's capacity by re-routing left-turns at nearby intersections

© ASCE. Since the opening of the first Diverging Diamond Interchange (DDI) in the U.S. in June 2009, 34 DDIs have been completed as of March 2014. At least 40 more DDIs are being planned/designed/constructed. The sheer number of DDI projects indicates this innovative design is gaining wide acceptanc...

Full description

Saved in:
Bibliographic Details
Main Authors: Wei Zhang, Nopadon Kronprasert
Format: Conference Proceeding
Published: 2018
Subjects:
Online Access:https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=84924987540&origin=inward
http://cmuir.cmu.ac.th/jspui/handle/6653943832/53563
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Chiang Mai University
id th-cmuir.6653943832-53563
record_format dspace
spelling th-cmuir.6653943832-535632018-09-04T10:02:34Z Unlock DDI's capacity by re-routing left-turns at nearby intersections Wei Zhang Nopadon Kronprasert Engineering Social Sciences © ASCE. Since the opening of the first Diverging Diamond Interchange (DDI) in the U.S. in June 2009, 34 DDIs have been completed as of March 2014. At least 40 more DDIs are being planned/designed/constructed. The sheer number of DDI projects indicates this innovative design is gaining wide acceptance. Field results demonstrate that this design is much more cost effective than the conventional improvement designs. By converting the 3-phase signal at traditional diamonds into 2-phase, DDI provides more effective green time for moving traffic. Most DDIs constructed to date are near large business, retail, and/or medical centers; and the intersections adjacent to DDI crossovers often have high traffic demands and require 6 or more phases and longer cycle length to serve the demands from conflicting movements. Such condition limits the DDI's capacity utilization. This study explored three approaches to reduce the cycle length at nearby signals - relaxed Bowtie, Superstreet, and Quadrant Roadway intersections. They can all convert the adjacent intersections into 2-phase operation and enable the DDI to operate more efficiently. The ideas were tested in a simulated environment at a proposed DDI in Anchorage, Alaska. The simulation results indicate level-of-service at nearby intersections may be improved from D/E to A/B. 2018-09-04T09:51:36Z 2018-09-04T09:51:36Z 2014-01-01 Conference Proceeding 2-s2.0-84924987540 10.1061/9780784413869.020 https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=84924987540&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/53563
institution Chiang Mai University
building Chiang Mai University Library
country Thailand
collection CMU Intellectual Repository
topic Engineering
Social Sciences
spellingShingle Engineering
Social Sciences
Wei Zhang
Nopadon Kronprasert
Unlock DDI's capacity by re-routing left-turns at nearby intersections
description © ASCE. Since the opening of the first Diverging Diamond Interchange (DDI) in the U.S. in June 2009, 34 DDIs have been completed as of March 2014. At least 40 more DDIs are being planned/designed/constructed. The sheer number of DDI projects indicates this innovative design is gaining wide acceptance. Field results demonstrate that this design is much more cost effective than the conventional improvement designs. By converting the 3-phase signal at traditional diamonds into 2-phase, DDI provides more effective green time for moving traffic. Most DDIs constructed to date are near large business, retail, and/or medical centers; and the intersections adjacent to DDI crossovers often have high traffic demands and require 6 or more phases and longer cycle length to serve the demands from conflicting movements. Such condition limits the DDI's capacity utilization. This study explored three approaches to reduce the cycle length at nearby signals - relaxed Bowtie, Superstreet, and Quadrant Roadway intersections. They can all convert the adjacent intersections into 2-phase operation and enable the DDI to operate more efficiently. The ideas were tested in a simulated environment at a proposed DDI in Anchorage, Alaska. The simulation results indicate level-of-service at nearby intersections may be improved from D/E to A/B.
format Conference Proceeding
author Wei Zhang
Nopadon Kronprasert
author_facet Wei Zhang
Nopadon Kronprasert
author_sort Wei Zhang
title Unlock DDI's capacity by re-routing left-turns at nearby intersections
title_short Unlock DDI's capacity by re-routing left-turns at nearby intersections
title_full Unlock DDI's capacity by re-routing left-turns at nearby intersections
title_fullStr Unlock DDI's capacity by re-routing left-turns at nearby intersections
title_full_unstemmed Unlock DDI's capacity by re-routing left-turns at nearby intersections
title_sort unlock ddi's capacity by re-routing left-turns at nearby intersections
publishDate 2018
url https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=84924987540&origin=inward
http://cmuir.cmu.ac.th/jspui/handle/6653943832/53563
_version_ 1681424158795235328