© 2015 IEEE. This work presents the reliability improvement of the electrical distribution system of the Thanaleng substation, by simulation analysis using the DIgSILENT Power Factory program. The study considered the outages in the distribution network from temporary and permanent faults. Consequen...
Saved in:
Main Authors: | , , |
---|---|
Format: | Conference Proceeding |
Published: |
2018
|
Subjects: | |
Online Access: | https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=84961801656&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/54446 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Chiang Mai University |
id |
th-cmuir.6653943832-54446 |
---|---|
record_format |
dspace |
spelling |
th-cmuir.6653943832-544462018-09-04T10:14:19Z Reliability improvement of the electrical distribution system of the Thanaleng Substation in Vientiane capital, Laos S. Khounnouvong S. Premrudeepreechacharn K. Ngamsanroaj Energy Engineering © 2015 IEEE. This work presents the reliability improvement of the electrical distribution system of the Thanaleng substation, by simulation analysis using the DIgSILENT Power Factory program. The study considered the outages in the distribution network from temporary and permanent faults. Consequently, outages frequently will directly affect commercial and private electrical consumption. Outages also deteriorate the power quality and reliability of power distribution systems. This paper presents a methodology for the prediction, evaluation and improvement of reliability indices in an electrical distribution system. The methods were based on power interruption analysis, involving the addition of protective equipment, improvement of system budgets and selection and installation of equipment such as re-closers and disconnect switches (DS) to improve the reliability of distribution. 2018-09-04T10:13:49Z 2018-09-04T10:13:49Z 2015-11-20 Conference Proceeding 2-s2.0-84961801656 10.1109/NAPS.2015.7335177 https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=84961801656&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/54446 |
institution |
Chiang Mai University |
building |
Chiang Mai University Library |
country |
Thailand |
collection |
CMU Intellectual Repository |
topic |
Energy Engineering |
spellingShingle |
Energy Engineering S. Khounnouvong S. Premrudeepreechacharn K. Ngamsanroaj Reliability improvement of the electrical distribution system of the Thanaleng Substation in Vientiane capital, Laos |
description |
© 2015 IEEE. This work presents the reliability improvement of the electrical distribution system of the Thanaleng substation, by simulation analysis using the DIgSILENT Power Factory program. The study considered the outages in the distribution network from temporary and permanent faults. Consequently, outages frequently will directly affect commercial and private electrical consumption. Outages also deteriorate the power quality and reliability of power distribution systems. This paper presents a methodology for the prediction, evaluation and improvement of reliability indices in an electrical distribution system. The methods were based on power interruption analysis, involving the addition of protective equipment, improvement of system budgets and selection and installation of equipment such as re-closers and disconnect switches (DS) to improve the reliability of distribution. |
format |
Conference Proceeding |
author |
S. Khounnouvong S. Premrudeepreechacharn K. Ngamsanroaj |
author_facet |
S. Khounnouvong S. Premrudeepreechacharn K. Ngamsanroaj |
author_sort |
S. Khounnouvong |
title |
Reliability improvement of the electrical distribution system of the Thanaleng Substation in Vientiane capital, Laos |
title_short |
Reliability improvement of the electrical distribution system of the Thanaleng Substation in Vientiane capital, Laos |
title_full |
Reliability improvement of the electrical distribution system of the Thanaleng Substation in Vientiane capital, Laos |
title_fullStr |
Reliability improvement of the electrical distribution system of the Thanaleng Substation in Vientiane capital, Laos |
title_full_unstemmed |
Reliability improvement of the electrical distribution system of the Thanaleng Substation in Vientiane capital, Laos |
title_sort |
reliability improvement of the electrical distribution system of the thanaleng substation in vientiane capital, laos |
publishDate |
2018 |
url |
https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=84961801656&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/54446 |
_version_ |
1681424322013429760 |