Re-engineering fiber optic production process by simulation, design for assembly line

This research aims to re-engineer the process in order to improve both productivity and quality of LC Duplex connector optical fiber production line. This re-engineering process research for fiber optic production process had adopted line balancing, design of assembly line and cellular manufacturing...

Full description

Saved in:
Bibliographic Details
Main Author: Wichai Chattinnawat
Format: Conference Proceeding
Published: 2018
Subjects:
Online Access:https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=62749197591&origin=inward
http://cmuir.cmu.ac.th/jspui/handle/6653943832/60214
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Chiang Mai University
id th-cmuir.6653943832-60214
record_format dspace
spelling th-cmuir.6653943832-602142018-09-10T03:41:40Z Re-engineering fiber optic production process by simulation, design for assembly line Wichai Chattinnawat Business, Management and Accounting Engineering This research aims to re-engineer the process in order to improve both productivity and quality of LC Duplex connector optical fiber production line. This re-engineering process research for fiber optic production process had adopted line balancing, design of assembly line and cellular manufacturing to improve the productivity and quality of the process. Simulation had been used as a mechanism for finding solutions of improvement. The design for assembly line adopts the optimization algorithm of minimizing the maximum between the operation times of each cells and its average. The results showed that the productivity was increased, line balancing efficiency was dramatically improved, and work in-process was reduced as well as the improvement in quality. © 2008 IEEE. 2018-09-10T03:39:26Z 2018-09-10T03:39:26Z 2008-12-01 Conference Proceeding 2-s2.0-62749197591 10.1109/IEEM.2008.4738108 https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=62749197591&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/60214
institution Chiang Mai University
building Chiang Mai University Library
country Thailand
collection CMU Intellectual Repository
topic Business, Management and Accounting
Engineering
spellingShingle Business, Management and Accounting
Engineering
Wichai Chattinnawat
Re-engineering fiber optic production process by simulation, design for assembly line
description This research aims to re-engineer the process in order to improve both productivity and quality of LC Duplex connector optical fiber production line. This re-engineering process research for fiber optic production process had adopted line balancing, design of assembly line and cellular manufacturing to improve the productivity and quality of the process. Simulation had been used as a mechanism for finding solutions of improvement. The design for assembly line adopts the optimization algorithm of minimizing the maximum between the operation times of each cells and its average. The results showed that the productivity was increased, line balancing efficiency was dramatically improved, and work in-process was reduced as well as the improvement in quality. © 2008 IEEE.
format Conference Proceeding
author Wichai Chattinnawat
author_facet Wichai Chattinnawat
author_sort Wichai Chattinnawat
title Re-engineering fiber optic production process by simulation, design for assembly line
title_short Re-engineering fiber optic production process by simulation, design for assembly line
title_full Re-engineering fiber optic production process by simulation, design for assembly line
title_fullStr Re-engineering fiber optic production process by simulation, design for assembly line
title_full_unstemmed Re-engineering fiber optic production process by simulation, design for assembly line
title_sort re-engineering fiber optic production process by simulation, design for assembly line
publishDate 2018
url https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=62749197591&origin=inward
http://cmuir.cmu.ac.th/jspui/handle/6653943832/60214
_version_ 1681425394601820160