Handling time in economic evaluation studies.
BACKGROUND: lime horizon and discounting are important issues in economic evaluation studies and have an impact on the priority of different programs. OBJECTIVE: Provides supporting rational and theories to propose the appropriate discount rate for both cost and effect and time horizon for conductin...
محفوظ في:
المؤلفون الرئيسيون: | , , |
---|---|
التنسيق: | دورية |
منشور في: |
2018
|
الموضوعات: | |
الوصول للمادة أونلاين: | https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=62449222001&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/60626 |
الوسوم: |
إضافة وسم
لا توجد وسوم, كن أول من يضع وسما على هذه التسجيلة!
|
الملخص: | BACKGROUND: lime horizon and discounting are important issues in economic evaluation studies and have an impact on the priority of different programs. OBJECTIVE: Provides supporting rational and theories to propose the appropriate discount rate for both cost and effect and time horizon for conducting economic evaluation studies in Thailand. MATERIAL AND METHOD: Describe the theories that explain time horizon for both the cost of a study and its effect. CONCLUSION: The recommended uniform discount rate for both costs and effects at the base case is 3% with a variance in range from 0-6% by sensitivity analysis. The time horizon should be long enough to capture the full costs and effects of the programs. |
---|