Effectiveness of Cascades Reservoir for Flood Control Operation and Electricity Production in Nam Ngum River
© Published under licence by IOP Publishing Ltd. The paper presents the effectiveness of cascade reservoir for the flood control operation and electricity production. The hydropower plants are Nam Ngum 1 and 2 Hydropower Plants (NNG1 and NNG2 HPPs), which locates in central Laos. Both plants are not...
Saved in:
Main Authors: | V. Keophila, A. Promwungkwa, K. Ngamsanroaj |
---|---|
Format: | Conference Proceeding |
Published: |
2019
|
Subjects: | |
Online Access: | https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=85067818384&origin=inward http://cmuir.cmu.ac.th/jspui/handle/6653943832/65870 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Chiang Mai University |
Similar Items
-
Optimal operation scheduling of Nam Ngum-1 and Nam Leuk hydropower plants
by: Deevanhxay P., et al.
Published: (2015) -
Application of Machine Learning for Predictive Maintenance Cooling System in Nam Ngum-1 Hydropower Plant
by: Sisavath Xayyasith, et al.
Published: (2019) -
Epidemiology of food-borne trematodes and other parasite infections in a fishing community on the Nam Ngum reservoir, Lao PDR
by: Sithithaworn P., et al.
Published: (2014) -
Epidemiology of food-borne trematodes and other parasite infections in a fishing community on the Nam Ngum reservoir, Lao PDR
by: Paiboon Sithithaworn, et al.
Published: (2018) -
CARBON BUDGET OF A VALLEY-TYPE CASCADE RESERVOIR IN THE UPPER MEKONG RIVER
by: LIN LIN
Published: (2019)