Quantile forecasting based on a bivariate hysteretic autoregressive model with GARCH errors and time -varying correlations

© 2019 John Wiley & Sons, Ltd. To understand and predict chronological dependence in the second-order moments of asset returns, this paper considers a multivariate hysteretic autoregressive (HAR) model with generalized autoregressive conditional heteroskedasticity (GARCH) specification and tim...

全面介紹

Saved in:
書目詳細資料
Main Authors: Cathy W.S. Chen, Hong Than-Thi, Mike K.P. So, Songsak Sriboonchitta
格式: 雜誌
出版: 2019
主題:
在線閱讀:https://www.scopus.com/inward/record.uri?partnerID=HzOxMe3b&scp=85070311925&origin=inward
http://cmuir.cmu.ac.th/jspui/handle/6653943832/66614
標簽: 添加標簽
沒有標簽, 成為第一個標記此記錄!
實物特徵
總結:© 2019 John Wiley & Sons, Ltd. To understand and predict chronological dependence in the second-order moments of asset returns, this paper considers a multivariate hysteretic autoregressive (HAR) model with generalized autoregressive conditional heteroskedasticity (GARCH) specification and time-varying correlations, by providing a new method to describe a nonlinear dynamic structure of the target time series. The hysteresis variable governs the nonlinear dynamics of the proposed model in which the regime switch can be delayed if the hysteresis variable lies in a hysteresis zone. The proposed setup combines three useful model components for modeling economic and financial data: (1) the multivariate HAR model, (2) the multivariate hysteretic volatility models, and (3) a dynamic conditional correlation structure. This research further incorporates an adapted multivariate Student t innovation based on a scale mixture normal presentation in the HAR model to tolerate for dependence and different shaped innovation components. This study carries out bivariate volatilities, Value at Risk, and marginal expected shortfall based on a Bayesian sampling scheme through adaptive Markov chain Monte Carlo (MCMC) methods, thus allowing to statistically estimate all unknown model parameters and forecasts simultaneously. Lastly, the proposed methods herein employ both simulated and real examples that help to jointly measure for industry downside tail risk.