การเปรียบเทียบต้นทุนงานแบบหล่อคานคอนกรีตระหว่างการซื้อวัสดุมาทำแบบหล่อกับการเช่าแบบหล่อ

Nowadays, the construction management has incorporated methods and technique for construction which had been developed for the benefit of projects and of the company. With the expansion in the Thai economy, construction work had come to play an important role in the development of the country as con...

Full description

Saved in:
Bibliographic Details
Main Author: เจตนา ศิริสานต์
Other Authors: ผศ.ดร.เศรษฐพงศ์ เศรษฐบุปผา
Format: Independent Study
Language:Thai
Published: เชียงใหม่ : บัณฑิตวิทยาลัย มหาวิทยาลัยเชียงใหม่ 2020
Online Access:http://cmuir.cmu.ac.th/jspui/handle/6653943832/69209
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Chiang Mai University
Language: Thai
id th-cmuir.6653943832-69209
record_format dspace
spelling th-cmuir.6653943832-692092020-07-31T00:49:50Z การเปรียบเทียบต้นทุนงานแบบหล่อคานคอนกรีตระหว่างการซื้อวัสดุมาทำแบบหล่อกับการเช่าแบบหล่อ Capital Comparison Between Hired and Purchased Concrete Formwork เจตนา ศิริสานต์ ผศ.ดร.เศรษฐพงศ์ เศรษฐบุปผา Nowadays, the construction management has incorporated methods and technique for construction which had been developed for the benefit of projects and of the company. With the expansion in the Thai economy, construction work had come to play an important role in the development of the country as construction management had assisted with management of resources, management of time expended by the project as well as proving options for selection of method of construction which will prove most beneficial. The author had therefore, been interested in the comparative study of costs for casting concrete beams incurred through the purchase of raw materials to make molds for casting beams as contrasted to the renting pre-made molds for concrete beams to cast steel re-enforced concrete beams of the project (Peamboon Co., Ltd.) to be used in the construction of a hotel to determine whether it would be more suitable to invest in the purchase of raw materials for making molds which would, in turn, indicate if it will be worth investing in the project. In the course of this comparative study of costs involved in beam casting work between the making of the molds and rental of molds for a hotel construction project of Peamboon Co., Ltd., the finding is that costs from the rental of molds were less than purchasing of raw materials to make beam molds. This study has consequentially, presented an option towards decision-making of the project in the future. The aforementioned information shall further assist with decision-making and guidethe approach of Peamboon Co., Ltd.’s management. 2020-07-31T00:49:50Z 2020-07-31T00:49:50Z 2015-12 Independent Study (IS) http://cmuir.cmu.ac.th/jspui/handle/6653943832/69209 th เชียงใหม่ : บัณฑิตวิทยาลัย มหาวิทยาลัยเชียงใหม่
institution Chiang Mai University
building Chiang Mai University Library
continent Asia
country Thailand
Thailand
content_provider Chiang Mai University Library
collection CMU Intellectual Repository
language Thai
description Nowadays, the construction management has incorporated methods and technique for construction which had been developed for the benefit of projects and of the company. With the expansion in the Thai economy, construction work had come to play an important role in the development of the country as construction management had assisted with management of resources, management of time expended by the project as well as proving options for selection of method of construction which will prove most beneficial. The author had therefore, been interested in the comparative study of costs for casting concrete beams incurred through the purchase of raw materials to make molds for casting beams as contrasted to the renting pre-made molds for concrete beams to cast steel re-enforced concrete beams of the project (Peamboon Co., Ltd.) to be used in the construction of a hotel to determine whether it would be more suitable to invest in the purchase of raw materials for making molds which would, in turn, indicate if it will be worth investing in the project. In the course of this comparative study of costs involved in beam casting work between the making of the molds and rental of molds for a hotel construction project of Peamboon Co., Ltd., the finding is that costs from the rental of molds were less than purchasing of raw materials to make beam molds. This study has consequentially, presented an option towards decision-making of the project in the future. The aforementioned information shall further assist with decision-making and guidethe approach of Peamboon Co., Ltd.’s management.
author2 ผศ.ดร.เศรษฐพงศ์ เศรษฐบุปผา
author_facet ผศ.ดร.เศรษฐพงศ์ เศรษฐบุปผา
เจตนา ศิริสานต์
format Independent Study
author เจตนา ศิริสานต์
spellingShingle เจตนา ศิริสานต์
การเปรียบเทียบต้นทุนงานแบบหล่อคานคอนกรีตระหว่างการซื้อวัสดุมาทำแบบหล่อกับการเช่าแบบหล่อ
author_sort เจตนา ศิริสานต์
title การเปรียบเทียบต้นทุนงานแบบหล่อคานคอนกรีตระหว่างการซื้อวัสดุมาทำแบบหล่อกับการเช่าแบบหล่อ
title_short การเปรียบเทียบต้นทุนงานแบบหล่อคานคอนกรีตระหว่างการซื้อวัสดุมาทำแบบหล่อกับการเช่าแบบหล่อ
title_full การเปรียบเทียบต้นทุนงานแบบหล่อคานคอนกรีตระหว่างการซื้อวัสดุมาทำแบบหล่อกับการเช่าแบบหล่อ
title_fullStr การเปรียบเทียบต้นทุนงานแบบหล่อคานคอนกรีตระหว่างการซื้อวัสดุมาทำแบบหล่อกับการเช่าแบบหล่อ
title_full_unstemmed การเปรียบเทียบต้นทุนงานแบบหล่อคานคอนกรีตระหว่างการซื้อวัสดุมาทำแบบหล่อกับการเช่าแบบหล่อ
title_sort การเปรียบเทียบต้นทุนงานแบบหล่อคานคอนกรีตระหว่างการซื้อวัสดุมาทำแบบหล่อกับการเช่าแบบหล่อ
publisher เชียงใหม่ : บัณฑิตวิทยาลัย มหาวิทยาลัยเชียงใหม่
publishDate 2020
url http://cmuir.cmu.ac.th/jspui/handle/6653943832/69209
_version_ 1681752616325873664