Task and worker assignment in the shared-machine U-shaped assembly line

© 2013 IEEE. This study presents a new approach on a U-shaped line namely, task and worker (double) assignment in the shared-machine U-shaped assembly line. A case study was done on a garment manufacturing company in Thailand. In order to revolutionize and consider the lean concept of waste reductio...

Full description

Saved in:
Bibliographic Details
Main Authors: P. Khemyong, R. Sirovetnukul
Other Authors: Mahidol University
Format: Conference or Workshop Item
Published: 2018
Subjects:
Online Access:https://repository.li.mahidol.ac.th/handle/123456789/33538
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Mahidol University