Single machine scheduling for multi-assembly jobs with preemption
© 2016 IEEE. This research proposes a mathematic model for scheduling multi-assembly jobs with uncertain arrival of raw materials or sub-assembly parts and allowable preemption, aiming to minimize tardiness penalty and set-up cost under a single machine. The experimental results show that using the...
Saved in:
Main Authors: | , , |
---|---|
其他作者: | |
格式: | Conference or Workshop Item |
出版: |
2018
|
主題: | |
在線閱讀: | https://repository.li.mahidol.ac.th/handle/123456789/43270 |
標簽: |
添加標簽
沒有標簽, 成為第一個標記此記錄!
|
機構: | Mahidol University |
總結: | © 2016 IEEE. This research proposes a mathematic model for scheduling multi-assembly jobs with uncertain arrival of raw materials or sub-assembly parts and allowable preemption, aiming to minimize tardiness penalty and set-up cost under a single machine. The experimental results show that using the exact algorithm (Branch and Bound) in Lingo 12 is not capable of solve the large-sized problems. Balancing tardiness and set-up cost (BTS) algorithm, therefore, is developed and is capable to solve much larger size of the problem with reasonable solution quality and computational time. |
---|