An Analysis of Cost Improvement Schemes for Electromagnetic Safety-Related Activities During Railway Project Implementation
In railway system construction, maintaining a reasonable cost of the system implementation has always been difficult without a well-defined strategy. This article describes the application of a switching algorithm to accommodate a reduction in cost drivers when performing a preinstallation electroma...
Saved in:
Main Author: | Chanpermpoonpol S. |
---|---|
Other Authors: | Mahidol University |
Format: | Article |
Published: |
2023
|
Subjects: | |
Online Access: | https://repository.li.mahidol.ac.th/handle/123456789/81314 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Mahidol University |
Similar Items
-
An Analysis of Cost Improvement Schemes for Electromagnetic Safety-Related Activities During Railway Project Implementation
by: Saridroje Chanpermpoonpol, et al.
Published: (2022) -
Implementation of urban railway projects
by: Tan, Wan Keng.
Published: (2008) -
Activity-based costing (ABC) : the testing & implementation of a contingency model
by: Lim, Bee Keow, et al.
Published: (2014) -
Activity-based costing : why and why not?
by: Choo, Hean, et al.
Published: (2014) -
Chinese Railways
by: Katrin Luger.
Published: (2017)