Water Flow Characteristic Investigation of Horizontal Screw Pump for Planned Mud Pump
Mud problem in Porong, Sidoarjo since May 29th 2006 is still becomes a complicated problem. Until the end of 2006, the cost spents in this case approximately 1500 billion rupiah. In 2008, legislative (DPR) given statement that Lapindo's case is a national disaster. By the way, as engineer, we h...
Saved in:
Main Author: | |
---|---|
Format: | Final Project |
Language: | Indonesia |
Online Access: | https://digilib.itb.ac.id/gdl/view/10348 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Institution: | Institut Teknologi Bandung |
Language: | Indonesia |