Water Flow Characteristic Investigation of Horizontal Screw Pump for Planned Mud Pump

Mud problem in Porong, Sidoarjo since May 29th 2006 is still becomes a complicated problem. Until the end of 2006, the cost spents in this case approximately 1500 billion rupiah. In 2008, legislative (DPR) given statement that Lapindo's case is a national disaster. By the way, as engineer, we h...

Full description

Saved in:
Bibliographic Details
Main Author: FIRMANSYAH (NIM 13104053), ENDY
Format: Final Project
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/10348
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia