#TITLE_ALTERNATIVE#

Inefficient activity in construction process still a burden. Too many waste and no value added. The advanced computer technology today's makes possible to do rapid simulation in order to evaluate the construction process due to eliminate inefficient activity. With CYCLONE modeling language, the...

Full description

Saved in:
Bibliographic Details
Main Author: AFFANDI (NIM 250 05 008), ERLANGGA
Format: Theses
Language:Indonesia
Online Access:https://digilib.itb.ac.id/gdl/view/10359
Tags: Add Tag
No Tags, Be the first to tag this record!
Institution: Institut Teknologi Bandung
Language: Indonesia
id id-itb.:10359
spelling id-itb.:103592017-09-27T15:23:35Z#TITLE_ALTERNATIVE# AFFANDI (NIM 250 05 008), ERLANGGA Indonesia Theses INSTITUT TEKNOLOGI BANDUNG https://digilib.itb.ac.id/gdl/view/10359 Inefficient activity in construction process still a burden. Too many waste and no value added. The advanced computer technology today's makes possible to do rapid simulation in order to evaluate the construction process due to eliminate inefficient activity. With CYCLONE modeling language, the observation is using COST software to run simulation. The observation evaluate earth moving operation with many resources; stone breaker, backhoe, and dump truck. The volume of soil to be moved in the earth moving operation was calculated to reach 1,4 million m3. The earth moving operation is divided into 4 areas each engaged by 4 subcontractors. The existing operation is in low productivity and it is behind schedule, and can not fulfill the target requirement finishing date. In order to accelerate the operation, earth moving's productivity must have increased to 2.222 m3/hour for each area. The simulation done by resource combination trials and errors. And then the optimum resource combination was selected and implemented in the field. The result of the modeling simulation was the combination of the resources used for the earth moving operation. The selected combination was within the targeted productivity. The number of equipments to be implemented for improving the productivity are, using 4 stone breaker, 3 back hoe, and 5 dump truck for each area.<p>In area 1, 3 stone breaker was added, using 3 backhoe, and 5 dump truck. This combination improve productivity operation in area 1 by 66,765 %.<p>In area 2, 1 stone breaker was added, using 3 backhoe, and 5 dump truck. This combination improve productivity operation in area 2 by 28,717 %.<p>In area 3, 1 stone breaker was added, using 3 backhoe, and 5 dump truck. This combination improve productivity operation in area 3 by 26,6 %.<p>In area 4, 3 stone breaker was added, using 3 backhoe, and 5 dump truck. This combination improve productivity operation in area 4 by, 38,346 %. <br /> text
institution Institut Teknologi Bandung
building Institut Teknologi Bandung Library
continent Asia
country Indonesia
Indonesia
content_provider Institut Teknologi Bandung
collection Digital ITB
language Indonesia
description Inefficient activity in construction process still a burden. Too many waste and no value added. The advanced computer technology today's makes possible to do rapid simulation in order to evaluate the construction process due to eliminate inefficient activity. With CYCLONE modeling language, the observation is using COST software to run simulation. The observation evaluate earth moving operation with many resources; stone breaker, backhoe, and dump truck. The volume of soil to be moved in the earth moving operation was calculated to reach 1,4 million m3. The earth moving operation is divided into 4 areas each engaged by 4 subcontractors. The existing operation is in low productivity and it is behind schedule, and can not fulfill the target requirement finishing date. In order to accelerate the operation, earth moving's productivity must have increased to 2.222 m3/hour for each area. The simulation done by resource combination trials and errors. And then the optimum resource combination was selected and implemented in the field. The result of the modeling simulation was the combination of the resources used for the earth moving operation. The selected combination was within the targeted productivity. The number of equipments to be implemented for improving the productivity are, using 4 stone breaker, 3 back hoe, and 5 dump truck for each area.<p>In area 1, 3 stone breaker was added, using 3 backhoe, and 5 dump truck. This combination improve productivity operation in area 1 by 66,765 %.<p>In area 2, 1 stone breaker was added, using 3 backhoe, and 5 dump truck. This combination improve productivity operation in area 2 by 28,717 %.<p>In area 3, 1 stone breaker was added, using 3 backhoe, and 5 dump truck. This combination improve productivity operation in area 3 by 26,6 %.<p>In area 4, 3 stone breaker was added, using 3 backhoe, and 5 dump truck. This combination improve productivity operation in area 4 by, 38,346 %. <br />
format Theses
author AFFANDI (NIM 250 05 008), ERLANGGA
spellingShingle AFFANDI (NIM 250 05 008), ERLANGGA
#TITLE_ALTERNATIVE#
author_facet AFFANDI (NIM 250 05 008), ERLANGGA
author_sort AFFANDI (NIM 250 05 008), ERLANGGA
title #TITLE_ALTERNATIVE#
title_short #TITLE_ALTERNATIVE#
title_full #TITLE_ALTERNATIVE#
title_fullStr #TITLE_ALTERNATIVE#
title_full_unstemmed #TITLE_ALTERNATIVE#
title_sort #title_alternative#
url https://digilib.itb.ac.id/gdl/view/10359
_version_ 1820664952123293696